r ("I'll <br /> ATTACHMENT F <br /> Indian River County Department of Utilities <br /> SUMMARY OF BIDS <br /> Project: CANAL WATER SUPPLY TO ALGAL TURF SCRUBBER SYSTEM <br /> Indian River County Bid No.1013038 <br /> Estimated Andrew <br /> Bid Bid Item Unit of TB Landmark TB Landmark Total Andrew Sltawork <br /> Quantity,Base Measure ICHA Unit Prices I�iA Total Base Bid Felix Unit Price Fell:Total Base Bid Unit Prices Base Bld Sitowork Unit Total Base Bid <br /> Item No. Den Hon Bid Prices <br /> I Maintenance ofTraille 1. LS $70,000.00 $70,000.00 $18,348.25 $18,348.25 $10,000.00 $10,000.00 $11,000.00 $11,000.00 <br /> 2 Insurance and Indemn6cation 1 LS $20,000.00 $20,000.00 $25.00 525.00 $390.00 $390.00 $120.00 $120.00 <br /> 3 Performance and Payment Bond 1 LS $30,000.00 $30,000.00 $16,488.00 $16,488,00 $14,000.001 $14,000.00 $34,862.00 $34,862.00 <br /> 4 Construction Stake-Out I LS $15,000.00 $15,000.00 $3,778.00 $3,778.00 $4,600.00 $4,600.00 $6,432.00 $6,432.00 <br /> 5 Asphalt Trench Repair and Replacement 613 LF $55.00 $33,715.00 $38.50 $23,600.50 $26.00 $15,938.00 $10.00 $6,130.00 <br /> 6 Thick)te Sidewalk and Driveway Removal and Replacement,(6-in g 485 SF $9.00 $31,365.00 $6.80 $23,698.00 $4.12 $14,358.20 $5.04 $17,564.40 <br /> 7 Site Restoration 1 LS $20,000.00 $20,000.00 $41,200.00 $41,200.00 $24,500.00 $24,500.00 $41,100.00 $41,100.00 <br /> 8 Connect to Existing 24-in Cane]Intake Watermain in 27th Street ROW 2 EA $3,000.00 $6,000.00 $2,008.50 $4,017.00 $3,500.00 $7,000.00 $1,840.00 $3,680.00 <br /> 9 Connect to Existing l4-inConcentrate Pipe atSROWTPSite 1 FA $4,000.00 $4,000.00 $2,992.00 $2,992.00 $3,500.00 $3,500.00 $7,018.00 $7,018.00 <br /> 10 Install 2"PVC Canal Intake Watermain Via Open Cut 4,593 LF $105.00 $482,265.00 569.00 $316,917.00 $93.00 $427,149.00 $99.00 $454,707.00 <br /> 11 Install 2"FPVC Aerial Crossing 128 LF $400.00 $51,200.00 $526.50 $67,392.00 $739.00 S94,592.00 $980.00 $125,440.00 <br /> 12 Install 24-in HDPE Directional Drill Canal Intake Watermain 1,479 LF $350.001 $517,650.00 $196.30 $290,327.70 $243.001 S359,397.001 <br />$251,001 $371,229.00 <br /> 12A OR Add Alternate-Install 24-in Fusible PVC Directional Drill $269.59 $314.61 <br /> Canal Intake Watermain LF <br /> 13 histall 12-in PVC Concentrate Pipe Via Open Cut 300 LF $65.00 $19,500.00 $30.101 $9,030.00 $48.00514,400.00 $57.00 $17,100.00 <br /> 14 Install 12-in HDPE Directional Drill Concentrate Pipe 258 LF $115.00 $29,670.00 $66.001 $17,028.00 $73.00 518,834.00 $93.00 $23,994.00 <br /> 14A OR Add Alternate-Install 12-in Fusible PVC Directioaa]Drill 595.09 $100.35 <br /> Canal Intake Watermain LF <br /> i5 Install 4-in PVC Via Open Cut 280 LF $40.00 $11,200.00 $18.0wo $5,040.00 $23.95 $6,706.00 $33.00 $9,240.00 <br /> 16 Install Fittings 10.2 TON $5,000.00 $51,000.00 $5,382.00 $54,896.40 $7,821.00 $79,774.20 $985.00 $10,047.00 <br /> 17 Install 16-in Gate Valve I EA $8,000.00 $8,000.00 $4,335.01l I $4,335.00 $4,700.00 $4,700.00 $5,187.00 $5,187.00 <br /> IS Install 12-in Gate Valve I EA $3,000.00 $3,000.00 $1,974.00,, $1,974.00 $2,800.00 $2,800.00 $2,566.00 $2,566.00 <br /> 19 Install"ARV w/Concrete Manhole Structure 5 EA $6,000.00 $30,000.00 $12,655.31 $63,276.55 $10,000.001 $50,000.00 $12,100.00 $60,500.00 <br /> 20 Install 4-in Aboveground ARV I EA $2,000.00 $2,000.00 $6,997.00 $6,997.00 $6,455.00 $6,455.00 $7,216.00 $7,216.00 <br /> 21 Relocate Water Services 2 EA $3,000.00 $6,000.00 $1,367.00 $2,734.00 $1,400.00 $2,800.00 $2,234.00 $4,468.00 <br /> 22 Record Drawings I LS $1,000.00 $1,000.00 $5,398.OQ $5,398.00 $4,000.00 $4,000.00 $2,324.00 $2,324.00 <br /> Subtotal Pipeline Facilities- $1,442,565.00 $979,492.40 $1,165,893.40 $1,221,924.40 <br /> Coutingenecy Fund(Note 1)- $140,000.00 $140,000.00 $140,000.00 $140,000.00 <br /> Subtotal 51,582,565.00 1 $1,119,492.40 1 $1,305,893.40 $1,361,924.40 <br /> 23 Mobilization(See Section 01025 for Maximum Allowable Amount) 1 LS $60,000.00 1 $60,000.00 1 $45,361.00 $45,361.00 523,002.60 523,002.60 $32,600.00 532,600.00 <br /> (Note 1)To be used by owner only and with written authorization only. <br /> BASE TOTAL CONSTRUCTION COST $1.642.565.00 $1.164.853.40 $1.328.896.00 $1.394.524.40 <br /> N <br /> O <br /> OContractors Bid Item List <br /> 00300-SA <br />