My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 2:59:54 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />AGENDA ITEM <br />Department of Public Works <br />LW Division of Facilities Management <br />Date: June 11, 2013 <br />To: Joseph A. Baird, County Administrator <br />Through: Christopher R. Mora, P.E., Public Works Director C-I_v,� <br />From: Lynn Williams, Facilities Manager/Project Manager <br />Subject: Crime Scene Facility Change Order # 3 P or Con ruction Company <br />Evidence Compound <br />BACKGROUND: <br />An agreement with Proctor Construction Company (Proctor) to construct the IRC Crime Scene <br />Facility located at 3885 41 st Street was approved by the Board on December 18, 2012. The <br />original contract amount was for $1,299,317.00. Included within the contract amount is an owner <br />contingency line item in the amount of $50,000.00. The contingency was established due to the <br />uncertainty of renovating an existing structure and possible unforeseen conditions with existing <br />underground facilities. <br />Change Order #1 was approved April 23, 2013 (item 8J) with no change to the contract amount. <br />Change Order #2 ($499,115) was approved at the June 18, 2013 meeting of the Board and <br />added the Evidence Compound to the project. <br />The attached Change Order #3 contains a total of 18 items impacting the project. These items <br />have been accepted by the project team and are brought forward as a single change order for <br />Board approval. The consultants have reviewed all items and I have received their concurrence. <br />Change Proposal CSO -003 <br />Item #1- Additional Air Conditioning Unit and Exhaust — (ADD $32,967.00) - This is change <br />is required by the IRC Fire Prevention to add ventilation in the Vehicle Processing area of the <br />Crime Scene Facility. Code requires ventilation of areas used for storage of vehicles in enclosed <br />spaces. <br />Item #2- Supply additional structural components — (ADD $5,089.44) - This change is <br />required to reinforce the metal framing for installation of the HVAC system required in Item #1. <br />Item #3- Additional side walk — (ADD $1, 564.00) — This change is required to provide a code <br />compliant path of egress from the secondary egress exit. <br />Item #4- Additional fill and grading — (ADD $1,500.00) -This change is required to add fill and <br />grading for the installation of the additional side walk. The side walk is adjacent to an existing <br />retention area. <br />Item #5- Generator slab modifications — (ADD $2,040.00)- This change modifies the original <br />(W concrete slab for the emergency generator and HVAC equipment to allow for the relocation of <br />HVAC equipment (credit) and adding structural reinforcement to carry generator weight. <br />FAPublic Works\Luanne M\Facilities Management\Sheriff Storage -New Bldg & Future Facility\Change order#3 l G <br />Proctor Construction crime scene 07-09-13.doc V <br />
The URL can be used to link to this page
Your browser does not support the video tag.