My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page Two <br /> Agenda Item for July 16, 2013 <br /> Crime Scene Facility Change Order# 3 Proctor Construction Company <br /> (W Evidence Compound <br /> Item#6-Condenser slabs—(ADD $5,460.00) -This change provides equipment concrete <br /> slabs and reinforcing walls to relocate HVAC condensing units. The slabs are directly adjacent <br /> to storm water retention areas. The relocation reduces the distance of the refrigerant piping and <br /> electrical. <br /> Item#7-Air compressor piping —(ADD $2,244.00) -This change provides for material and <br /> installation of compressed air from the compressor location to the evidence fume hood located <br /> in the evidence processing lab. <br /> Item#8—Additional condensate piping—(ADD $1,045.00) -This change is related to the <br /> additional HVAC equipment required for the vehicle processing area and included installation of <br /> a drywell as required by code. <br /> Item#9-Security System —(ADD $7,170.00) -This change is to provide a partitioned <br /> electronic security system to the building to comply with the Security policies of the Sheriffs <br /> office. <br /> Item#10-Additional framing—(ADD $1,630.00) - This change is to provide additional interior <br /> framing for the relocation of exhaust and intake louvers due to modifications to add HVAC in <br /> vehicle processing area. <br /> Item #11-Change Plywood rating —(ADD $490.00)—This change is to replace existing <br /> plywood decking and add inner wall backing for mounted electronic equipment with fire <br /> (W retardant materials. <br /> Item#12—Add two benches—(ADD $300.00)-This change adds two benches in the shower <br /> area of the restrooms to comply with ADA related building codes. <br /> Item#13-Added electrical/Data—(ADD $2,830.00)—This change adds electrical and data <br /> outlet locations in areas of the building as per Sheriff Staff walk through. <br /> Item#14—Added electrical AHU-10—(ADD $849.39)-This change provides electrical service <br /> to the HVAC equipment added to the Vehicle processing area. <br /> Item#15—Added galvanized panels —(ADD $1,078.00)-This change increases the quantity <br /> of galvanized security mesh panels. <br /> Item#16-Added electrical —(ADD $276.65)—This change adds electrical outlets in the photo <br /> lab and includes a credit for shortening of other equipment circuits. <br /> Item#17—Added electrical—(ADD $225.57)—This change extends the electrical service to <br /> AHU-1 which was relocated to avoid required access to evidence storage vault. <br /> Item#18—Sewer line—(ADD $2,423.00) -The sewer line replacement authorized in COM <br /> was revised to lower the invert of the line. This requires a deeper trench and will require a gravel <br /> bed in the trench. <br /> Item #19-Owner contingency CREDIT—(DEDUCT $7,212.30) -This is the credit towards <br /> charges listed above and reduces the owner contingency amount to Zero Dollars. <br /> Misc—(ADD $11,043.98) 10% Overhead markup , 5% ,Profit markup,1% Insurance markup,1% <br /> (W Bond markup. <br /> F:\PublicWorks\Luanne M\Facilities Management\Sheriff Storage-New Bldg&Future Facility\Change order#3 2 <br /> Proctor Construction crime scene 07-09-13.doc 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.