Laserfiche WebLink
MMO <br />LCTOR <br />zruction Co. <br />General Contractors <br />CGC034069 <br />2050 US -1 Suite 200, <br />Vero Beach, Florida 32960 <br />Telephone: (772) 234-8164 <br />Fax: (772) 234-8188 <br />www.proctorec.com <br />A <br />Monday, July 08, 2013 <br />Mr. Lynn Williams <br />Indian River County Board of County Commissioners <br />1801 27th Street <br />Vero Beach, FL 32960 <br />RE: Potential Change Order Number CSI -016 <br />Indian River Crime Scene Investigation Facility-IRC-CSI01/2013 <br />Dear Mr. Williams, <br />Reference is made to Indian River County Board of County Commissioners request from Proctor <br />Construction to provide pricing covered under PCO Number CSI -016, for the following extra work: <br />Permit Drawings and Building Department Changes. <br />The following is a detailed itemization of all extra costs. <br />Item Number <br />Description <br />Proposed Amount <br />Company <br />001 <br />Furnish and install (1) AHU-10 per <br />$32,967.00 <br />DYNAMIC <br />building department request for make- <br />up air in the Vehicle Storage Room. <br />Furnish and install Exhaust Fan and <br />Louver as per building department <br />request. Material=$30,167 <br />Labor—$2,800 <br />002 <br />Supply and install 8" 16 ga Purlins @ <br />$5,089.44 <br />RF <br />24'-0" long to support AHU-10, <br />Supply and install (2) framed openings <br />for new 24" x 24" louver including <br />required trim, and 8" C -Channel <br />003 <br />Furnish and install concrete for added <br />$1,564.00 <br />DOYLE <br />Sidewalk as per building department <br />request for building egress. <br />004 <br />Extra import fill and grading for added <br />$1,500.00 <br />CATHCO <br />sidewalk per plans revised 2/18/13 <br />005 <br />Credit for Generator Slab $1,440 (10' x <br />$2,040.00 <br />DOYLE <br />45'x 6") Plan Dated 12-3-12 <br />Add for New Structural Slab $3,480 <br />per ML Drawing Date 5-3-13 (11'-8 x <br />22'x 8") with # 4 @ 12" EW 7 (11'-8" <br />x Tx 4") with wire mesh <br />006 <br />Condenser Support Slabs and Stem <br />$5,460.00 <br />DOYLE <br />Walls (6-10" x 23'x 4") (4'-5" x 21- <br />5"x 4" <br />007 <br />Furnish and install compressor line in <br />$2,244.00 <br />SNYDER <br />copper to Owner's Hood 160'3/4" <br />copper <br />008 <br />Furnish and install ]-1/2 PVC <br />$1,045.00 <br />SNYDER <br />condensate for AHU-10 to new <br />dryweIl for vehicle storage bay. <br />009 <br />Furnish and install turn -key eight <br />$7,170.00 <br />CELEC <br />partition security system as per <br />regulator request thru Sheriff <br />Department. <br />010 <br />Furnish and install Framing for louver <br />$1,630.00 <br />PP <br />and exhaust fans <br />011 <br />Chane plywood backing for the <br />$490.00 <br />PP <br />100 <br />