My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> zCTOR Monday,July 08,2013 <br /> ruction Co. <br /> General Contractors Mr.Lyme Williams <br /> CGC034069 Indian River County Board of County Commissioners <br /> 1801 27th Street <br /> 2050 us-1 suite 200, Vero Beach,FL 32960 <br /> Vero Beach,Florida 32960 <br /> Telephone:(772)234-8164 <br /> Fax:(772)234-8188 RE: Potential Change Order Number CSI-016 <br /> www.proctorec.com Indian River Crime Scene Investigation Facility-IRC-CSI01/2013 <br /> Dear Mr.Williams, <br /> Reference is made to Indian River County Board of County Commissioners request from Proctor <br /> Construction to provide pricing covered under PCO Number CSI-016,for the following extra work: <br /> Permit Drawings and Building Department Changes. <br /> The following is a detailed itemization of all extra costs. <br /> Item Number Description Proposed Amount Company <br /> 001 Furnish and install(1)AHU-10 per $32,967.00 DYNAMIC <br /> building department request for make- <br /> up air in the Vehicle Storage Room. <br /> Furnish and install Exhaust Fan and <br /> Louver as per building department <br /> request.Material=$30,167 <br /> Labor—$2,800 <br /> 002 Supply and install 8" 16 ga Purlins @ $5,089.44 RF <br /> 24'-0"long to support AHU-10, <br /> (W Supply and install(2)framed openings <br /> for new 24"x 24"louver including <br /> required trim,and 8"C-Channel <br /> 003 Furnish and install concrete for added $1,564.00 DOYLE <br /> Sidewalk as per building department <br /> request for building egress. <br /> 004 Extra import fill and grading for added $1,500.00 CATHCO <br /> sidewalk per plans revised 2/18/13 <br /> 005 Credit for Generator Slab$1,440(10'x $2,040.00 DOYLE <br /> 45'x 6")Plan Dated 12-3-12 <br /> Add for New Structural Slab$3,480 <br /> per ML Drawing Date 5-3-13(11'-8 x <br /> 22'x 8")with#4 @ 12"EW 7(11'-8" <br /> x Tx 4")with wire mesh <br /> 006 Condenser Support Slabs and Stem $5,460.00 DOYLE <br /> Walls(6-10"x 23'x 4")(4'-5"x 21- <br /> 5"x 4" <br /> 007 Furnish and install compressor line in $2,244.00 SNYDER <br /> copper to Owner's Hood 160'3/4" <br /> copper <br /> 008 Furnish and install ]-1/2 PVC $1,045.00 SNYDER <br /> condensate for AHU-10 to new <br /> dryweIl for vehicle storage bay. <br /> 009 Furnish and install turn-key eight $7,170.00 CELEC <br /> partition security system as per <br /> regulator request thru Sheriff <br /> Department. <br /> 010 Furnish and install Framing for louver $1,630.00 PP <br /> and exhaust fans <br /> 011 Chane plywood backing for the $490.00 PP <br /> 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.