My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
07/16/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:15:07 PM
Creation date
3/23/2016 8:59:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Minutes
Meeting Date
07/16/2013
Meeting Body
Board of County Commissioners
Book and Page
274
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NH.tif
SmeadsoftID
14222
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Photography Equipment per Keyed <br /> (W Note 08 on sheet A2.11,and the <br /> plywood decking on the framed <br /> platforms per section details 1,2,3 on <br /> sheet A4.21 from non fire retardant <br /> plywood <br /> 012 Add for(2)Laminated 42"x 20"bench $300.00 BRAKIT <br /> seats <br /> 013 Added Electrical/Data/Receptacles in $2,830.00 CELEC <br /> CST Conference Rm,Imaging Rm. <br /> Computer Rm,Photo Study,Training <br /> Rm,Rm 116 per Sheriff Department <br /> request in on-site walk-thru. <br /> 014 Provide added power for the AHU-10 $849.39 CELEC <br /> and Exhaust Fan <br /> 015 Added Galvanized Panels in Areas $1,078.00 PP <br /> exposed not included in previous PCO <br /> 016 Provide(2)new home run circuits to $276.65 CELEC <br /> Photo,Relocate CU runs(4),Credit for <br /> Shortened CU run.Add One(1)30 <br /> arnp Twist Lock Receptacle <br /> 017 Relocated AHU extended.electrical $225.57 CELEC <br /> conduit and wire 501. <br /> 018 RFI 18-Changes to New Sanitary Line $2,423.00 CATHCO <br /> due to invert out of the building <br /> lowering <br /> 019 Owner Contingency Credit#2- ($7,212.30) PCC <br /> Balance$7,212.30 <br /> Level 1 10.00%Overhead Markup $6,196.98 <br /> Level 2 5.00%Profit MarkuD $3,408.34 <br /> (W Level 3 1.00%Insurance Markup $715.75 <br /> Level 4 1.00%Bond Markup $722.91 <br /> Total Amount $73,013.73 <br /> Days Requested 0 <br /> This Change Order Request includes but is not limited to,the following qualifications and/or <br /> clarifications: <br /> 1. Work specifically outlined within the summary included in each subcontractors change order <br /> request. <br /> 2. This proposal includes the building department comments included in the permit drawings <br /> dated 1-14-13. <br /> 3. This proposal includes a credit against the Owner Contingency of$7,212.30.The Owner <br /> contingency has now been reduced to$0. <br /> 4. <br /> If you have any questions regarding this Change Order Request,please call me at your earliest <br /> convenience, <br /> Respectfully, <br /> Nick Bischoff <br /> Project Manager <br /> (W Please sign below signifying approval to proceed with the above stated scope of work. <br /> Architect Date <br /> Owner Date 1 O 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.