My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2013AP-B
CBCC
>
Meetings
>
2010's
>
2013
>
08/20/2013AP-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:27:24 PM
Creation date
3/23/2016 9:00:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet B
Document Type
Agenda Packet
Meeting Date
08/20/2013
Meeting Body
Board of County Commissioners
Book and Page
393
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NK.tif
SmeadsoftID
14225
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Surrounding Land Uses: North: Vacant, 53' Street/A-1, RS-3 <br /> (W South: 49th Street, Residential, Agriculture/RS-3, A-1 <br /> East: 58th Avenue, Residential/PD <br /> West: Agriculture/A-1 <br /> 8. Open Space and Recreation: Open space and PD recreation area requirements will be <br /> exceeded through the provision of private parks, community trails,perimeter buffers,internal <br /> lakes, and private open space directly available to project residents. Some of those recreation <br /> and open space areas and facilities will be available to the public. Public open spaces will <br /> include a market green,amphitheater,green space,and pedestrian areas. In addition,there will <br /> be environmental areas and park areas that are open to the public on an invitation basis. <br /> Recreation Area: Required: 5.85 acres (3.2%) <br /> Provided: 29.66 acres (16.26%) <br /> Note: The required recreation area is based on 527.72 sq.ft.of recreation area per unit. <br /> Open Space: Required: 44% <br /> Provided: 44.7% <br /> Note: The open space requirement is prorated based on the land use and zoning code <br /> criteria applicable to the project site. In this case, project open space includes <br /> 24.7 acres of the 50.8 acres of lakes within the stormwater tracts. <br /> (W <br /> 9. Phasing: The project is divided into 3 phases, each with sub-phases (see attachment#7 sheet <br /> #4). As structured,the phasing plan ensures that each phase or aggregation of phases will be <br /> able to "stand on its own" with respect to the applicable land development regulations and <br /> required improvements. Also, the phasing ensures proper timing of infrastructure <br /> improvements. <br /> Phase I includes most of the eastern portion of the site. That part of the project will have the <br /> majority of the residential units and stormwater ponds as well as most of the commercial <br /> development. Phase II consists mostly of the western portions of the project site, including <br /> recreation areas, residential units, and some commercial. Phase III consists of several <br /> commercial infill sites located near the east/northeast edge of the project site. <br /> Number of Units Comments <br /> Phase I 249 residential units Includes roughly half the commercial area <br /> (A,B, C) ("Market Place"), a town hall, mail <br /> facility, stormwater ponds, clubhouse, and <br /> traffic improvements. <br /> Phase II 232 residential units Includes the remainder of project residential <br /> (A,B, C, D) units, the hotel, the golf course, and other <br /> recreation improvements. <br /> Phase III (no 0 residential units Includes commercial infill building <br /> sub-phases) locations "within"the Phase I commercial <br /> area. <br /> FACommunity Deve1opment\CurDev\BCC\2013 BCC\ProvidencePointereport.doc 9 535 <br />
The URL can be used to link to this page
Your browser does not support the video tag.