My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2013AP-B
CBCC
>
Meetings
>
2010's
>
2013
>
08/20/2013AP-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:27:24 PM
Creation date
3/23/2016 9:00:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet B
Document Type
Agenda Packet
Meeting Date
08/20/2013
Meeting Body
Board of County Commissioners
Book and Page
393
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NK.tif
SmeadsoftID
14225
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Le <br /> d) Right-turn and left-turn lanes at the project's full access connection to 58th <br /> Avenue <br /> e) Construct 53rd Street west of 58th Avenue as a 4 lane paved roadway consistent <br /> with the alignment of 53rd Street east of 58th Avenue, as part of a developer's <br /> agreement, and as depicted on the conceptual plan. <br /> f) Contribution to the 58th Avenue and 49th Street ultimate intersection build-out. <br /> All of the above improvements and contributions will be made by the applicant in the <br /> applicable development phase that contains the respective intersection/obligation. Also, <br /> the improvements and contributions will be the subject of conditions of the applicable <br /> phase of the preliminary PD plan. Prior to issuance of a certificate of completion for a <br /> given phase,the appropriate improvements or developer's agreement activities must be <br /> complete to the satisfaction of Indian River County. <br /> In addition to the above listed site related improvements, the applicant is fully <br /> responsible for the following off-site improvements: <br /> a) 58th Avenue and 45th Street —construct left-turn lanes at the intersection <br /> approaches (Developer's Agreement) (Phase IA) <br /> ,,. b) 58th Avenue and 41St Street—optimize signal timing (Phase IA) <br /> C) 58th Avenue and 41St Street—construct northbound right-turn lane(Phase IIB) <br /> d) 58th Avenue and 491h Street — provide "temporary" span wire traffic signal <br /> (Phase IA) <br /> External Sidewalks: <br /> An 8' wide sidewalk is required along the project's 49th Street frontage, and a 5' wide <br /> sidewalk is required along the site's 58th Avenue frontage. Those improvements are <br /> acknowledged by the applicant and will be depicted on subsequent preliminary PD <br /> plans. The required sidewalks will be constructed or bonded out in each applicable <br /> phase where the respective sidewalk is located. <br /> Internal Pedestrian System: <br /> The development will have a sidewalk and community trail system to facilitate <br /> pedestrian access through the project for residents and users of the project's public <br /> areas. The pedestrian system will be linked at various points to the external pedestrian <br /> system(e.g. 58th Avenue and 49th Street sidewalks). Portions,of the community trail and <br /> internal sidewalk system will be constructed with each phase. <br /> FACommunity Deve1opment\CurDev\BCC\2013 BCC\ProvidencePointereport.doc 13 539 <br />
The URL can be used to link to this page
Your browser does not support the video tag.