My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/20/2013AP-B
CBCC
>
Meetings
>
2010's
>
2013
>
08/20/2013AP-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:27:24 PM
Creation date
3/23/2016 9:00:28 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet B
Document Type
Agenda Packet
Meeting Date
08/20/2013
Meeting Body
Board of County Commissioners
Book and Page
393
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NK.tif
SmeadsoftID
14225
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preliminary PD plan approval of the Market Place/commercial area along 53rd Street and 58`h <br /> Avenue, the applicant must submit and receive staff approval of a sign package that reflects a <br /> consistent aesthetic theme for the project. <br /> 19. Streetscape Improvements: Streetscape improvements are important elements of TND Policy <br /> 18.1. Those elements include street trees,on-street parking,hardscape improvements(such as <br /> street furniture, streetlights, and planters), and wide sidewalks. Consistent with Policy 18.1, <br /> streetscape improvements need to be provided throughout the development. As part of each <br /> preliminary PD plan approval,the applicant will be required to submit and obtain approval of a <br /> streetscape plan that meets TND Policy 18.1 criteria. <br /> Along the northern project perimeter, the applicant is proposing to culvert a portion of the <br /> IRFWCD ditch located on the south side of 53rd Street. The section of ditch to be culverted <br /> runs from 58`h Avenue to the project's westernmost 53rd Street driveway connection. While not <br /> required,that culverting is proposed to enhance the streetscape for the northern project access. <br /> 20. TND Architectural Requirements: As part of the preliminary PD plan for each project phase, <br /> a detailed site plan that addresses architectural issues will be required. For any of the single- <br /> family areas, a plan book of all models proposed in that area must be submitted with the <br /> preliminary PD plan to ensure that the layouts meet the TND criteria of Policy 18.1 and the <br /> conditions of this report. The plan book will contain a typical floor plan of the unit and <br /> architectural elevations of all building sides. During the life of the project, the applicant is <br /> (W allowed to change and develop new models, subject to aesthetic criteria and staff approval. <br /> 21. Planned Development Waivers and Modifications: The types of units and waivers proposed <br /> for Providence Pointe are typical for TND communities. As proposed, the Providence Pointe <br /> plan is based largely on the design concepts of the Baldwin Park TND located in Orlando,some <br /> sections of Charleston, as well as the Windsor development here in Indian River County. The <br /> proposed zoning dimensional modifications are provided in detail in attachment#4 of this staff <br /> report. <br /> In general, the zoning dimensional modifications allow for a more compact form of <br /> development with greater concentration of open space. Specifically,lot sizes will be reduced to <br /> a range of 1,100 sq. ft (22' x 50') to 9,500 sq. ft. to provide for a variety of housing types, <br /> including Townhomes,Livework units,Courtyard homes,Golf Cottages,Sideyard homes,and <br /> Estate Homes. The setbacks will be reduced to facilitate those specific types of homes. In <br /> addition,the dimensional modifications provide specific setbacks for secondary structures like <br /> garages and other structures, such as arcades, balconies, porches, step terraces, and stoops, <br /> customarily found with the proposed architectural style. The dimensional modifications are <br /> necessary to implement the development design as proposed. <br /> Traffic Engineering and Emergency Services have agreed with the applicant regarding modifications to <br /> roadway design standards for the project. Those modifications affect right-of-way width,intersection <br /> radii,and intersection alignments,and are necessary to facilitate the proposed roadway layout which is <br /> key to creating a Traditional Neighborhood Design project. Those proposed modifications allow for <br /> (W more pedestrian friendly designs,flexible building placement, and a more compact human scale. The <br /> agreed-to modifications are listed in attachment#5. <br /> FACommunity Deve1opment\CurDev\BCC\2013 BCC\ProvidencePointereport.doc 16 542 <br />
The URL can be used to link to this page
Your browser does not support the video tag.