Laserfiche WebLink
Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations...............................NTE$0.00 $20,000.00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey$112/Hr)......................................................................NTE$0.00 $20,000.00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing-pavement <br /> At the north end of the project................................................NTE$0.00 $27,000.00 <br /> Construction Engineering Services-Public Works .............NTE$0.00 $77,877.12 <br /> Construction Engineering Services-Utility Dept.................. NTE$0.00 $10,446.24 <br /> TOTAL HOURL YRATE ALLOWANCES...........................NTE$0.00 $206,323.36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> ProjectEngineer Manager..............................................$146.64 <br /> ProjectEngineer............................................................... $109.70 <br /> �. Senior CADD Operator...................................................... $85.84 <br /> CaddDraftsman.................................................................. $56.89 <br /> SurveyProject Manager.................................................... $106.40 <br /> Professional Surveyor........................................................ $98.30 <br /> Survey CADD Tech............................................................ $6817 <br /> 3 Man Field Crew............................................................. $126.84 <br /> 2 Man Field Crew............................................................. $114.14 <br /> SrField Coordinator......................................................... $75.00 <br /> Page 3 of 4 <br /> GALNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 14 8-19-13 .doe <br /> 109 <br />