My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:29:46 PM
Creation date
3/23/2016 9:01:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/10/2013
Meeting Body
Board of County Commissioners
Book and Page
349
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NL.tif
SmeadsoftID
14226
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations...............................NTE$0.00 $20,000.00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey$112/Hr)......................................................................NTE$0.00 $20,000.00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing-pavement <br /> At the north end of the project................................................NTE$0.00 $27,000.00 <br /> Construction Engineering Services-Public Works .............NTE$0.00 $77,877.12 <br /> Construction Engineering Services-Utility Dept.................. NTE$0.00 $10,446.24 <br /> TOTAL HOURL YRATE ALLOWANCES...........................NTE$0.00 $206,323.36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> ProjectEngineer Manager..............................................$146.64 <br /> ProjectEngineer............................................................... $109.70 <br /> �. Senior CADD Operator...................................................... $85.84 <br /> CaddDraftsman.................................................................. $56.89 <br /> SurveyProject Manager.................................................... $106.40 <br /> Professional Surveyor........................................................ $98.30 <br /> Survey CADD Tech............................................................ $6817 <br /> 3 Man Field Crew............................................................. $126.84 <br /> 2 Man Field Crew............................................................. $114.14 <br /> SrField Coordinator......................................................... $75.00 <br /> Page 3 of 4 <br /> GALNR Support\ADMIN\Marketing\Proposals\WPB\2013\66 th Ave Amendment No 14 8-19-13 .doe <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.