My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:29:46 PM
Creation date
3/23/2016 9:01:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/10/2013
Meeting Body
Board of County Commissioners
Book and Page
349
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NL.tif
SmeadsoftID
14226
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Professional Services Fee <br /> 1. The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows: <br /> The following is a summary of costs: <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Project Limits Compensation <br /> Geotechnical Services(Tierra)(Lump Sum) ................................$0.00 $139,460.00 <br /> Engineering(ARCADIS) (Lump Sum)...................................$6,715.00 $960,690.50 <br /> Signal Plans(ARCADIS)................................................................$0.00 $84,726.66 <br /> Design Survey(6e Avenue) (ARCADIS)....................................... $0.00 $169,500.00 <br /> Design Survey(Sidestreets) (ARCADIS)......................................... $0.00 $71,428.00 <br /> Right-of-Way Survey and Map (6e Avenue)................................. $0.00 $117,821.00 <br /> Right-of-way Survey (Sidestreets).................................................... $0.00 $61,963.00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates,Inc.)...................................................... $0.00 $207,222.00 <br /> Landscape&Irrigation.................................................................... $0.00 $77,160.00 <br /> (Thomas Lucido &Associates) (Lump Sum) <br /> PondSurveys..................................................................................... $0.00 $25,790.00 <br /> Water Main Plans (ARCADIS).....................................................$0.00 $86,145.00 <br /> (Lump Sum) <br /> Corridor Study(ARCADIS)...........................................................$0.00 $15,581.00 <br /> Cultural Resource Assessment......................................................$0.00 $8,925.93 <br /> TOTAL PROFESSIONAL SERVICES................................... $6,715.00 $2,026,413.09 <br /> HOURL YRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels(375.00%ach)................NTE$0.00 $51,000.00 <br /> (W <br /> Page 2 of 4 <br /> GALNR Support\A.DKNMarketing\Proposals\WPB\2013\66 th Ave Amendment No 14 8-19-13 .doc <br /> 108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.