My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/10/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/10/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:29:46 PM
Creation date
3/23/2016 9:01:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/10/2013
Meeting Body
Board of County Commissioners
Book and Page
349
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000F\S0004NL.tif
SmeadsoftID
14226
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida's Leading Engineering Source <br /> Envirnnn+entel • Geotechnical Construction Materials Testing Threshold a Special Inspections Private Provider Services&Code Compliance <br /> 'QY <br /> ' FRNAro� ATTACHME July 5, 2013 <br /> Indian River County <br /> Attention: Keith McCully <br /> 1801 27th Street, Building "A" <br /> Vero Beach, FL 32960 <br /> Phone: (772) 226-1268 <br /> Email: kmccullyCa)-ircgov.com <br /> Subject: Constructional Materials Testing Proposal <br /> P.C. South Algal Nutrient Removal Facility <br /> 1225 SW 5th Street <br /> Vero Beach, Florida <br /> Indian River County <br /> GFA Proposal No. 13-1437.00 <br /> Dear Mr. McCully, <br /> GFA International, Inc. (GFA) appreciates the opportunity to become a part of your <br /> project team. Our professional engineers, geologists, and operations staff are dedicated <br /> to making this project a success, both on schedule and within budget. We are proud of <br /> our commitment to maintaining the highest levels of customer service and client <br /> satisfaction, and respectfully submit the following for your consideration. <br /> It is the understanding of GFA that this project will consist of the construction of access <br /> roads and driveways, concrete work pads, pumping facilities, force mains, concrete algal <br /> growth floway, influent and effluent flow control structures, harvest structure, harvest <br /> pond, control buildings, pole barn, stormwater collection and treatment system, polishing <br /> pond, artificial wetland, 10-mgd pumping station, and connection to a 24" influent force <br /> main and a 12" influent force main. <br /> SCOPE OF SERVICES <br /> 1. Construction Materials Testing Services <br /> 1. CONSTRUCTION MATERIALS TESTING SERVICES <br /> The services described herein will be performed as required by the construction <br /> documents and local jurisdictions. Please note that the overall cost of construction quality <br /> control programs is dependent upon the contractor's scheduling, weather and other <br /> factors beyond our control. In general, the scope of services will consist of the following: <br /> 1.1 Laboratory Soil Testing <br /> OFFICES THROUGHOUT FLORIDA <br /> „^,a Like.t t?a t .I-:- Ct,...:.l.. ')An6C is7'9\(%')A '}C9C +-?' AnA ')CQn ,r_..f _ .__�_r_.. _.___ 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.