My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1991
CBCC
>
Meetings
>
1990's
>
1991
>
6/4/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:24:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/04/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m 4 <br />BOOK J PAht � 4 <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />Change Order #1 and the final pay request to Ted <br />Myers Construction, as recommended by staff. <br />(CHANG ORDER IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD) <br />OWNER/ENGINEER CONTRACT FOR ENGINEERING SERVICES FOR THE STUDY <br />DESIGN, PERMITTING. CONSTRUCTION ADMINISTRATION AND INSPECTION OF <br />A CENTRAL REGION ALTERNATE EFFLUENT DISPOSAL AND TRANSMISSION <br />SYSTEM <br />The Board reviewed memo from Environmental Engineer Robert <br />Wiseman dated.May 1, 1991: <br />DATE: MAY 1, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />i; DIRECTOR OF UTILITY SERVICES <br />PREPARED ROBERT 0. WISEMEN, P.E. <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: OWNER/ENGINEER CONTRACT FOR ENGINEERING SERVICES FOR <br />THE STUDY, DESIGN, PERMITTING, CONSTRUCTION, <br />` ADMINISTRATION, AND INSPECTION OF A CENTRAL REGION <br />ALTERNATE EFFLUENT DISPOSAL AND TRANSMISSION SYSTEM <br />INDIAN RIVER COUNTY PROJECT NO. US -90 -23 -ED <br />BACKGROUND <br />On February 19, 1991, the Board of County Commissioners authorized <br />the Department of Utility Services to conduct negotiations with the <br />selected firms and to proceed with an agreement based upon <br />negotiations. <br />ANALYSIS <br />Negotiations with Professional Engineering Consultants, Inc. (PECI) <br />for the subject services has been completed, and a "Standard Form of <br />Agreement Between Owner and Engineer for Professional Services" has <br />been submitted to the County for approval. Phase I --Immediate <br />Effluent Reuse/Disposal System Improvements --consists of development <br />of disposal methodology and hydraulic loading rates at selected <br />sites (existing County's own 30 -acre site and Bent Pine Golf <br />Course), design of a stabilized access road to the property from <br />Kings Highway, and design of an instrumentation/ control system, <br />including flowmetering, control, and telemetry to automatically <br />monitor and control future interconnections of all regions. <br />Phase II --Investigation concerning REWARD System --includes studying, <br />analyzing, and developing a proposal concerning effluent perimeter <br />well extraction located on the County's own 30 -acre site and <br />subsequent injection of recovered/reclaimed effluent for development <br />of a saltwater intrusion hydraulic barrier system. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.