Laserfiche WebLink
Total estimated construction cost is $2,465,800. The estimated lump <br />sum fee for Phase II design services with one prime contract is <br />$135,619. This fee will be adjusted when firm construction costs <br />are known, and shall be based on FmHA percentages. Additional <br />services of the Engineer are estimated to be $74,658 with one <br />construction contract, and include field surveying, soils <br />investigation, computer disk copies of as -built drawings, assessment <br />roll, and resident project services. If more than one construction <br />contract is necessary, additional services would increase by <br />$13,460 per additional contract. <br />All fees shall conform to FmHA guidelines. <br />Carter Associates, Inc., has been selected for Phase III of the <br />plan. Negotiations have resulted in the same basic agreement as for <br />Phase II. Phase III includes 5,300 L.F. of 18" water main on 8th <br />Street from 58th Avenue west to Pine Tree Park; 2,600 L.F. of 12" <br />water main on 33rd Street from 58th Avenue west. Also included are <br />Pine Tree Park (718), Diana Park (23), Westgate Colony (84), <br />Greenbriar (60), Verona Estates (100), Rivera Estates (72), <br />Cherrywood (15), Sunniland (18), and Cherry Lane Manor (22) <br />subdivisions. <br />_Total estimated construction cost is $2,454,000. The estimated lump <br />sum fee for Phase III design services with one prime contract is <br />$134,970. This fee will be adjusted when firm construction costs <br />are known, and shall be based on FmHA percentages. Additional <br />services of the Engineer are estimated to be $87,150 with one <br />construction contract, and include field surveying, soils <br />investigation, computer disk copies of as -built drawings, assessment <br />roll, and resident project services. If more than one construction <br />contract is necessary, additional services would increase by <br />$14,120 per additional contract. <br />All fees shall conform to FmHA guidelines. <br />RECOMMENDATION: <br />The Department of Utility Services recommends approval of the <br />agreements with McQueen and Associates for Phase II, and with Carter <br />Associates, Inc., for Phase III design and additional services for <br />the respective estimated fees as stated above. <br />MOTION WAS MADE by Commissioner Scurlock, SECONDED by <br />Commissioner Bowman, to approve the agreements with <br />McQueen and Associates for Phase II and with Carter <br />Associates, Inc. for Phase IIIas described by staff. <br />Commissioner Eggert had concerns about an increase of over <br />$13,000 per additional contract. She noted that we have got a <br />construction contract; then, all of a sudden, we have additional <br />services that are way up and it seems like we keep going up. <br />Utilities Director Pinto pointed out that the breaking up of <br />contracts means totally separate contracts, new specifications, <br />etc., and involves much extra time and effort. <br />Commissioner Scurlock felt that Commissioner Eggert has a <br />legitimate concern, but noted that we work off the Farmers Home <br />curve. <br />Director Pinto further noted that outside the design curve, <br />there is also a curve for inspections and we have tried to keep <br />within that. <br />UN I 11991 <br />33 1 CA - <br />BOOK CFr.a Wjj <br />J <br />