My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/18/1991
CBCC
>
Meetings
>
1990's
>
1991
>
6/18/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:29:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/18/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attorney Vitunac advised that this is our new concurrency <br />form that the Board asked be brought back to them on every <br />occasion. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously (3-0) approved <br />Developer's Agreement for Concurrency Review with <br />Sebastian General Partnership as recommended by staff. <br />SAID AGREEMENT IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD. <br />DEVELOPER'S AGREEMENT (R.TALLMAN - SQUIRE VILL. MOBILE HOME PARK) <br />The Board reviewed memo from Capital Projects Engineer <br />William McCain: <br />DATE: JUNE 7, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED WILLIAM F. McN <br />AND STAFFED CAPITAL PROJE GZNnR <br />BY: DEPARTMENT OF ''O�Y SERVICES <br />SUBJECT: DEVELOPER'S AGREEMENT WITH RICHARD T. TAL MAN <br />(SQUIRE VILLAGE MOBILE HOME PARR) <br />BACKGROUND <br />","As part of the terms extended by the Board of County <br />Commissioners to mobile home parks for financing of impact fees <br />(prior to the increase of impact fees), Richard T. Tallman, owner of <br />Squire Village, desires to connect to County water and sewer. The <br />impact fees he will be paying are $37,526.00 and $41,093.00 for 29 <br />ERUs water and wastewater, respectively. Squire Village is located <br />approximately one-half mile south of Oslo Road on 27th Avenue. The <br />Park's connection to the/County water and wastewater system will <br />eliminate a private water and wastewater supply and is in keeping <br />with the Utilities Department drive toward regionalization of <br />utilities. <br />ANALYSIS <br />To connect to our water system, a line must be constructed from <br />Squire Village north on 27th Avenue to Oslo Road. The Utilities <br />Department is requiring an oversizing on this line of 6 inches, <br />which equates to a County contribution in construction of <br />$31,440.00. Other details of the agreement are covered in the <br />attached Developer's Agreement and cover both water and wastewater. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached. Developer's <br />Agreement with Richard T. Tallman. <br />8 1991 <br />167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.