My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/2/1991
CBCC
>
Meetings
>
1990's
>
1991
>
7/2/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:31:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/02/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />OWNER 11 <br />ORDER <br />ARCHITECT 0 <br />CONTRACTOR 0 <br />AIA DOCUMENT G701 <br />FIELD 0 <br />_. <br />OTHER 0 <br />PROJECT: I.R.C. Utilities Warehouse CIiANGE ORDER NUMBER: 2R <br />(name, address) Ixora Utilities complex DATE: 05/14/91 <br />Vero Beach, F1 <br />TO CONTRACTOR: Hunley—Hubbard Const. ARCHITECT'S PROJECT NO: 4005 <br />(name, address) P.O. Box 6388 CONTRACT DAZE: 12/20/90. <br />Vero Beach, F1 32961 <br />CONTRACT FOR: Metal Building <br />The Contract Is changed as follows: <br />INSTALL EMERGENCY EXIT LIGHTS AS PER FIRE MARSHALL $ 300. <br />ERECT WOOD DUMPSTER FENCE AND LATCHING GATE $ 1,587. <br />ADD SIDEWALK AS PER SITE PLAN $ 675. <br />INSTALL ADDITIONAL CULVERT & HEADWALL AS PER D.O.T. $ 705. <br />Inrtinn 111vn Go <br />L t111nl <br />Approved once <br />✓ _ <br />tJtrlrtl�s; _ <br />(c f 7`71 <br />_. <br />Not valid until signed by the Owner, Architect and Contractor. <br />The original (Contract Sum) (Guaranteed Maximum Price) was ........................ S $ 44,480 <br />Net change by previously authorized Change Orders ............................... f $ 53,844 <br />The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was .......... s 98,324 <br />The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) <br />(unchanged) by this Change Order in the amount of ............................ f $ 3,267 <br />The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be .. S $ 101, 591 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( +0 ) days <br />The date of Substantial Completion as of the date of this Change Order therefore is <br />NOTE: This summary docs not rclleci changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by <br />Construction Change Directive. <br />Hunley Hubbard Const <br />ARCHITECT C:ONIRAC;TOR <br />P.O. <br />BOX 6388 <br />Addreses Addrss <br />Vero Beach,, F1n <br />BY ©Y <br />DATE DATE <br />05/14/91 <br />AIA DOCUMENT 6701 • CHANGE ORDER • 1987 EDITION • AIA® • O1987 • THE <br />AMERICA.\ INSTITUTE OF ARCHITECTS. 173$ NEW YORK AVE., N.W., WASHINGTON, DC. 20006 <br />JUL 2 1991 - <br />L- <br />Indian River County <br />"'TA50 25th Street <br />Address <br />Vero Beach, F1 <br />BY 4 <br />DATE <br />G701-1987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.