My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/9/1991
CBCC
>
Meetings
>
1990's
>
1991
>
7/9/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:33:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/09/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
price of $3,500 for the removal and $24,320 for utility sleeves. If <br />these prices were added to the base bid, Sheltra is still $610,364.90 <br />lower than the next bidder. In view of the above and in accordance <br />with Indian River Purchasing Manual Staff recommends the Board to <br />waive this "technicality and/or irregularity" and award this bid to <br />Sheltra and Son's for a amended total of $2.743,809.15. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously waived the <br />above described "technicality and/or irregularity" and <br />awarded Bid 91-89 for Indian River Boulevard North, <br />Phase III, to Sheltra 8 Sons in the amended amount of <br />$2,743,809.15. <br />I.R.BOULEVARD PHASE III - CONSTRUCTION MANAGEMENT 8 INSPECTION <br />SERVICES <br />Public Works Director Davis reviewed the following: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E., : <br />Public Works Director <br />FROM: Terry B. Thompson, P.E. <br />Capital Projects Manager " <br />SUBJECT: Indian River Boulevard Phase III <br />Construction Management and Inspection Services <br />References: IRC Bid 91-89 <br />DATE: July 2, 1991 <br />DESCRIPTION AND CONDITIONS <br />Boyle Engineering Corporation is under contract with Indian <br />River County to provide Construction Administration Services <br />for the full twelve month construction period of Indian <br />River Boulevard Phase III and full-time on-site Resident <br />Inspection Services for the initial six months of <br />construction when concurrent activities are expected to be <br />intense. <br />The 1986 budget price for Construction Administration <br />Services, which provided for a Resident Inspector for the <br />full twelve month construction period, was $97,110. In <br />April 1991.County Staff met with the Consultant to negotiate <br />the Construction Services and the Consultant proposed <br />compensation in the amount of $163,350. Staff was of the <br />opinion that inspection services during the last six months <br />of construction could be performed by County Staff and <br />prepared an agreement with Boyle Engineering which included <br />full-time on-site Resident Inspection Services for the <br />initial six months of construction and contract <br />administration services for the full twelve month <br />construction period at a cost not to exceed the 1986 <br />budgeted cost of $97,110. <br />17 <br />JL 9 199 <br />BOOK (33 <br />F';t <br />
The URL can be used to link to this page
Your browser does not support the video tag.