My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/16/1991
CBCC
>
Meetings
>
1990's
>
1991
>
7/16/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:09 PM
Creation date
6/16/2015 10:35:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/16/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />JUL 16 BOOK 83 PAGE &S <br />DATE: JULY 5, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI Y RVICES <br />STAFFED AND <br />PREPARED BY: ROBERT O. WISEMEN, P.E. <br />ENVIRONMENTAL ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: SOUTH COUNTY REGIONAL WASTEWATER TREATMENT PLANT `- <br />AGREEMENT FOR ENGINEERING SERVICES AND PROPOSAL FOR <br />WORK AUTHORIZATION NO. 1 <br />IRC PROJECT NO. US -90 -20 -DC <br />BACKGROUND: <br />On January 29, 1991, the Board of County Commissioners authorized <br />the Department of Utility Services to conduct negotiations and to <br />proceed with an agreement with the selected firms, based upon the <br />negotiations. <br />ANALYSIS:. <br />Negotiations with Camp Dresser and McKee Inc. (CDM Inc.), the first <br />choice firm for the subject services, have been completed. The <br />Standard Form of Agreement between Owner and Engineer for <br />Professional Services has been submitted to the County for approval. <br />Work Authorization No. 1 includes preliminary engineering design, <br />final design, bidding services and contract administration during <br />construction, resident project representative, permitting <br />assistance, and additional engineering services, such as <br />geotechnical investigation, surveying, aerial photography and <br />landscape architecture for the design and construction of the South <br />County Regional Wastewater Treatment Plant, with the proposed site <br />location at the South County R.O. Water Treatment Plant. <br />The agreed-upon lump sum fee for preliminary <br />j engineering design: <br />The total in permitting services to obtain <br />F.D.E.R., $t. Johns River Water Management <br />District, and E•.P.A. permits, as necessary <br />(based on 280 work hours), together with <br />the unforeseen permitting services, on an <br />as -needed basis, with an upper limit cost <br />of $20,000.00: <br />The total in additional engineering services <br />(geotechnical, surveying, aerial, and <br />landscaping), together with the unforeseen <br />-additional engineering services, on an as -needed <br />basis, with an upper limit cost of $10,000.00: <br />Upper Limit Subtotal: <br />$57,770.00 <br />42,490.00 <br />36,500.00 <br />$136,760.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.