My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/13/1991
CBCC
>
Meetings
>
1990's
>
1991
>
8/13/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:10 PM
Creation date
6/16/2015 10:35:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/13/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: JULY 29, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />•A <br />'FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTIL T 'RVICES <br />STAFFED AND <br />PREPARED BY: WILLIAM F.IN <br />CAPITAL PR ENGI <br />�• DEPARTMENT ITY SERVICES <br />AND <br />ROBERT O. WISEMEN,. P.E. <br />ENVIRONMENTAL ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: 'WATER SERVICE TO INDIAN RIVER COUNTY MIDDLE <br />AND HIGH SCHOOLS AT C.R. 512 <br />IRC PROJECT NOS. UW -91 -20 -DS AND US -91 -21 -CS <br />I <br />BACKGROUND: <br />..ti.. <br />:On "January 29, 1991, the Chairman of the Board of County• <br />Commissioners executed the agreement between Indian River County andJ <br />Indian River County School Board for utility service connections for <br />..the above -referenced schools (see attachment). 'The status of thei <br />"items in the agreement is as follows: <br />Item 1. The water connection to Citrus Elementary is complete. <br />Item 2. To be acted upon at the direction of the School Board. <br />Item 3. Design is being performed. Permitting and connection will <br />be completed within 80 days. <br />Item 4. Design is being performed. Permitting and connection will <br />be completed within 120 days. <br />Item 5. School Board is to complete this item. <br />North County Middle School and New North County High School: <br />School Board has requested both water and sewer service to the <br />existing North County Middle School and the new North County <br />High School in early 1992. <br />The staff is ready to proceed with in-house design for the water <br />main, which.will be extended from an existing main approximately 100 <br />feet south of the Kings Highway and North Winter Beach Road <br />intersection to the school site, through Kings Highway, C.R. 510, <br />and 90th Avenue (see attached map). <br />ANALYSIS: <br />1 <br />The <br />staff's preliminary <br />estimated construction project cost iso <br />$1,188,484.00; a <br />preliminary cost breakdown <br />as related -to cost' <br />sharing is shown <br />below: <br />1. 10,560 LF of <br />20" pipe @ <br />$32.00/LF <br />$ 337,920.00 <br />2. 13,200 LF of <br />20" pipe @ <br />$32.00/LF <br />422,400.00 ** <br />3. 15,840 LF of <br />12" pipe @ <br />$18.00/LF <br />285,120.00 ** <br />4. 3 canal crossings, <br />lump <br />sum <br />35,000.00 ** <br />Subtotal: <br />$1,080,440.00 <br />10% Contingency: <br />108,044.00 <br />Total: <br />$1,188,484.00 <br />13 <br />AUG 13 1991 BOOK 1 FNAs 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.