Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
W <br />We have outlined the total engineering cost for design below".- <br />Survey <br />elow: <br />Survey fee quotes: <br />Kimball/Lloyd, Inc. --------- <br />Carter Associates, Inc. $10,000.00 <br />Masteller, Moler & Reed, Inc. 4,940.00 <br />Kimley-Horn and Associates, Inc. 6,300.00 <br />Four quotes for the project survey were obtained <br />and are listed above; we are recommending that we <br />proceed with Kimball/Lloyd, Inc., for this work <br />(see attached quotes). <br />.Estimated administrative costs, including postage, <br />reproduction, and permitting fees <br />Soil and other additional professional services <br />(to include canal crossing structural, soil <br />corrosiveness testing, etc.), with upper limit of <br />Engineering fees (by County personnel) <br />Total Estimated Design Cost <br />The total project cost (design and construction) is <br />$338,870.00. <br />COMMENDATION <br />1 <br />$3,870.00 <br />$5,000.00 <br />10,000.00 <br />20.000.00 <br />$38,870.00 <br />i <br />The Department of Utility Services recommends that the Board of I <br />County Commissioners approve proceeding with in-house design,, <br />permitting, and bidding to construct the project, and authorizei <br />execution of the attached agreement with Kimball/Lloyd, Inc. for j <br />surveying., <br />v H F <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />proceeding with in-house design, permitting and <br />bidding to construct the above described project and <br />authorized the Chairman to execute the agreement <br />with Kimball/Lloyd, Inc. for surveying, as <br />recommended by staff. <br />SAID AGREEMENT IS ON FILE IN THE OFFICE OF <br />CLERK TO THE BOARD <br />45 <br />AUG `1 199-1 <br />D00!(/. f'A6r.ld <br />