Laserfiche WebLink
there would be no building or shared functional areas supporting the individual <br />departmental spaces. <br />As a final thought on the current report, I should also emphasize our <br />recommendation that the County strive to achieve a 2010 solution to its judicial facility <br />needs. Assuming facility occupancy in late 1993 or early 1994, a building constructed <br />to serve only until 2000 would provide too short a period of useful occupancy prior to <br />substantial expansion. I recognize that this represents a departure from the planning of <br />the mid- to late 1980's, but I believe that the County will be best served by the longer <br />scenario. <br />The impact of the differences between the 1988 report and our -conclusions is a <br />building about 14,000 square feet larger than was originally anticipated. If there is good <br />news in that increase, it is that 118,000 square feet will serve the County's needs to the <br />year 2010. The earlier report stated a year 2000 need of only 104,000 square feet with <br />growth to 133,000 by the year 2010. (The 1988• overstatement of- net areas got larger as <br />the planning period was extended from 2000 to 2010.) - <br />I hope that this brief explanation helps 'to clarify area differences between the <br />earlier report and the work which we have done. I look forward to answering any <br />questions which the Board may have at the meeting currently scheduled for September <br />24th. Meanwhile, please let me know if I may provide any additional clarification or <br />assistance. <br />;Since el�y, <br />Michael F. Thomas <br />President <br />Notes: (1) The ADC Scenarios did not include net spaces for Facility Support Functions such as lobby, loading dock, janitorial areas, central vending. <br />(-2) The ADC Scenarios did not include building grossing factor to account for the exterior skin, public and staff restrooms, public circulation, vertical circulation, fire stairs. <br />(*3) These spaces would be constructed -to accommodate the 2010 space need. Personnel, furniture, and equipment would be added on an as -needed basis. <br />49 <br />SEP 4v' <br />�y�j%. L/�(�"{�� IQrI' A ®'/ a �� ! •y. r o, a (yµ, �� dB <br />L <br />Table6. <br />COMPARISON OF ADG AND PGAUJPA PLANNING STRATEGIES <br />(Option #1) <br />Indian Riaer County Florida <br />ADC STRATEGY <br />PGAL l /PA STRATEGY <br />PHASE I <br />PHASE H <br />PHASE I <br />PHASE If <br />Section <br />component <br />Build to 2000 <br />Renovate to 2010 <br />Build to 2000 <br />Renovate to 2010 <br />1.000 <br />CIRCUIT AND COUNTY COURTS <br />4Z359 (7 Courts) <br />48,991 (8 Courts) <br />29,538 (6 Courts) <br />34,182 C Courts) <br />2.000 <br />CLERK OF COURT - Administration <br />1,269 <br />1,458 <br />1,3M -3 <br />1,364 <br />CLERK OF COURT - Finance <br />6,669 <br />9,450 <br />Admin. Bldg. (4,074) <br />Admin. Bldg. (4,776) <br />CLERK OF COURT -Data Processing <br />Admin. Bldg. <br />Admin. Bldg. <br />Admin. Bldg. (2,471) <br />Admin Bldg. (,708) <br />3.000 <br />CLERK OF COURT - Courthouse <br />23,260 <br />31,232 <br />26,854 -3 <br />26,854 <br />4.000 <br />LAWLIBRARY <br />2,410 <br />3,085 <br />3,295 -3 <br />3,295 <br />5.000 <br />PUBLIC DEFENDER <br />6,669 <br />9,261 <br />4,979 -3 <br />4,979 <br />6.000 <br />COURT SECURITY/ CENTRAL HOLDING <br />4,001 <br />6,320 <br />1,961 -3 <br />1,961 <br />WARRANTS / CIVIL PROCESS DIVISION <br />0 <br />0 <br />2,222 -3 <br />2,222 <br />7.000 <br />STATEATTORNEY <br />7,486 <br />11,239 <br />9,439 -3 <br />9,439 _ <br />8.000 <br />COURTSUPPORTFUNCTIONS <br />4,355 <br />5,976 <br />2,565 •-3 <br />2,565 <br />9.000 <br />FACILITY SUPPORT FMC17ONS <br />0 -1 <br />0 11 <br />6,360 -3 <br />6,360 <br />DEPARTME ML GROSS SQUARE FOOTAGE <br />98,477 <br />127.012 <br />88,577 <br />93,221 <br />MECHANICAL / ELECTRICAL <br />4,924 6% of DGSF) 6,351 <br />5,315 (6%- of DGSF) S S93 <br />DGSFSUBTOTAL <br />103,401 <br />133,363 <br />93,892 <br />98,814 <br />BUILDING GROSS SQUARE FOOTAGE (120 Factod <br />124,081 -2 '.: <br />160,D35 2112 <br />670 <br />118 577 <br />Notes: (1) The ADC Scenarios did not include net spaces for Facility Support Functions such as lobby, loading dock, janitorial areas, central vending. <br />(-2) The ADC Scenarios did not include building grossing factor to account for the exterior skin, public and staff restrooms, public circulation, vertical circulation, fire stairs. <br />(*3) These spaces would be constructed -to accommodate the 2010 space need. Personnel, furniture, and equipment would be added on an as -needed basis. <br />49 <br />SEP 4v' <br />�y�j%. L/�(�"{�� IQrI' A ®'/ a �� ! •y. r o, a (yµ, �� dB <br />L <br />