My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/15/1991
CBCC
>
Meetings
>
1990's
>
1991
>
10/15/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:44:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/15/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by'Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously (4-0, <br />Commissioner Eggert being absent) awarded IRC Bid 92-25 <br />as an Open End Contract to K&S Rip Rap with an <br />estimated value of $35,000 per year, as set out in the <br />above staff recommendation. <br />M. IRC Bid 92-24 - Curb and Gutter - Annual Bid <br />The Board reviewed the following memo dated 10/3/91: <br />DATE: October 3, 1991 <br />TO: BOARD OF COUNTY COMMISSIONERS <br />THRU: James E. Chandler, County Administrator <br />H.T. "Sonny" Dean, Director <br />Department of General ServicmR, <br />4i-, FHOM: 7 Fran Boynton, Purchasing Manager. <br />f SUBJ: 92-24/Curb and Gutter <br />..:-County Wide Annual Contracts <br />BACKGROUND INFORMATION: <br />Bid. Opening Date: September 18, 1991 <br />Specifications mailed to: Three (3) Vendors <br />Replies: Two (2) Vendors <br />BID TAB UNIT PRICE (Linear Foot) <br />PAVCO Type F - $ 6.70/LF <br />Indiatlantic, F1 Type E - <br />Drop Curb $ 6.70/LF <br />i"Fersch Construction Type F - $13:00/LF <br />Vero Beach, F1 Type E - $11.00/LF <br />Drop Curb $10.50/LF <br />r RECOMMENDATION: <br />Staff recommends the award Of an Open End Contract.to <br />Pavco Const. <br />with an estimated value of $20,000.00 per year. <br />Also, -authorize <br />the Purchasing Manager to ..renew the Contract <br />subject to sat- <br />isfactory performance, zero cost increase, vendor acceptance, and <br />the determination that renewal is in the best <br />interest of the <br />County. The initial contract period shall begin on the date of <br />award. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.