My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/15/1991
CBCC
>
Meetings
>
1990's
>
1991
>
10/15/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:44:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/15/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CT BOOK �'�• �d"1� <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E., <br />Public Works Director ct�r <br />FROM: Terry B. Thompson, P.E., <br />Capital Projects Manager <br />SUBJECT: South Beach Recreation Path <br />Changes and Additions <br />REF. LETTER: Neil Schopke, Schopke Constructton and <br />Engine .ring to T _pry Thompson slated <br />October 8, 1rJZ. <br />• DATE: October 8, 1991 FILE: alapath.agn <br />_DESCRIPTION AND CONDITIONS <br />Schopke Construction and Engineering, Inc. is under contract <br />.with the City of Vero Beach for the construction of a reuse <br />water main along AlA in conjunction with the County's South-* <br />Beach Recreation Path. Construction of these two projects <br />.were combined through a Joint Construction Project Agreement% <br />ti between Indian River County and the City Of Vero Beach. <br />Recent rains .have identified two drainage., problems.' The <br />"first problem will require installation of a..concrete pipe <br />under a driveway. The second problem will require raising <br />the swale grade approximately one foot. These revisions are <br />detailed on the attached referenced letter...:,,N <br />f:.The cost of these changes and additions is $6,342.20.• This <br />'•-•added to the current contract amount of $218,026.89 results <br />�111,in a new contract amount of $224,369.09." The.. total.. <br />i -estimated cost of *the recreation path in the -special <br />E assessment providing resolution was. $409,286.67 which: <br />includes engineering and administration costs: - <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Board request the City of Vero <br />j <br />Beach -to issue a Change Order for the attached changes and <br />additions. Funding is from Account 173-214-541-066.31. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously (4-0, <br />Commissioner Eggert being absent) authorized staff <br />to request the City of Vero Beach to issue a Change <br />Order for the above -listed additions and changes as <br />recommended by staff. <br />RESOLUTION AUTHORIZING THE EXECUTION OF THE FIND GRANT AGREEMENT <br />FOR ROUND ISLAND PARK IMPROVEMENTS <br />The Board reviewed memo from Capital Projects Manager Terry <br />Thompson dated October 8, 1991: <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.