My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/1991
CBCC
>
Meetings
>
1990's
>
1991
>
10/22/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:45:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/22/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESCRIPTION AND CONDITIONS <br />The paving of the above roads have been completed. The final <br />assessments are as follows: <br />1) 715th Place Preliminary Estimates Final Cost <br />$12, 921.87•_ - 100% $12, 662.23 - 100% <br />$ 9,691.40 - 75% $ 91686.60 - 75%* <br />(2.79 Acres) (2.79 Acres) <br />$ 3,473.62/per Acre $ 3,471.90/per Acre' <br />2) 35th Avenue Preliminary Estimates Final Cost <br />$44,039.49 - 100% $32,778.36 - 100% <br />$33,029.62 - 75% $25,075.45 - 75%* <br />(1166.30 Front Footage)(1166.30 Front Footage) <br />$28.32/per FF $21.50/per FF <br />Driveway Costs <br />$ 6,161.00 - 100% <br />$ 41620.75 - 75%** <br />3) 85th Avenue Preliminary Estimates <br />& 85th Court $196,146.89 - 100% <br />Paradise Park $147,110.17 - 75% <br />(113 Parcels) <br />$1,301.86/per Parcel <br />* This figure includes <br />** See Assessment Roll <br />each property owner. <br />Final Cost <br />$153,898.61 - 100% <br />$117,732.44 - 75%* <br />(113 Parcels) <br />$1,041.88/per Parcel <br />Driveway Costs <br />$26,864.49 - 100% <br />$20,148.37 - 75%** <br />2% Tax Collector's fee. <br />for individual cost to <br />The final assessment rolls have been prepared and are ready to bei <br />delivered to the Clerk to the Board. Assessments for 85th Avenue <br />& 85th Court in.Paradise Park Subdivision and 15th Place are to be <br />paid within 90 days or in 2 equal installments, the first to be <br />made twelve months from the due date and subsequent payments to be <br />due yearly from the due date at an interest rate of 9.75�stahl i shed <br />by the Board of County Commissioners. During the public.hearing <br />for paving 35th Avenue, the Board extended the payment schedule to <br />five years. The assessments are to be paid within 90 days or in <br />five equal installments, the first to be made twelve months from <br />the due date and subsequent payments to be due yearly from the due <br />date at an interest rate of 9.,75%. <br />The assessment roll for 35th Avenue, and 85th Avenue and 85th Court <br />show a cost for driveway construction. This driveway construction <br />work was provided on these roads due to the Stormwater Management <br />System and the need to prevent erosion of drives and eliminate the <br />possibility of maintenance problems to dives. <br />On 85th Avenue and 85th Court in Paradise Park Subdivision, some <br />driveways were larger than others and therefore the total cost for <br />some parcels having the larger drives, including the cost of paving <br />and drainage total exceeded the preliminary assessment. In this <br />case the preliminary assessment figure was used as the final <br />assessment cost. <br />ALTERNATIVES AND ANALYSIS <br />Since the final assessment to the benefitted owners is less than or <br />equal to the preliminary assessment roll, the only alternative <br />presented is to approve the final assessment rolls. <br />�1 <br />49 <br />ROG� 4 PAGE �cJi ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.