My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/1991
CBCC
>
Meetings
>
1990's
>
1991
>
10/22/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:45:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/22/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCT 2 2 T g <br />UL <br />BACKGROUND: <br />A petition has been received for a water main extension for 36th <br />Avenue to supply potable water to its residents. We are now coming <br />to the Board of County Commissioners to seek approval to begin <br />design of the above project (see attached petition and plat map). <br />ANALYSIS: <br />The subdivision contains 16 lots owned by 16 owners. Two of the <br />lots abut on 8th Street and are included in the 12th Street Water <br />Service Project, presently under construction; therefore, 14 lots <br />shall benefit from this project. Several owners were not readily <br />available to sign. The 10 property owners signing the petition <br />represent 71.43% of the properties to be served. All of the lots in <br />this project are slightly over one acre in size. <br />The attached map displays the area to benefit from the assessment <br />project. <br />This project is to be paid through the assessment of property owners <br />along the proposed water line route. In the interim, financing will <br />be through the use of impact fee funds. Design services will be <br />provided by the Department of Utility Services. <br />RECOMMENDATION: <br />The staff of the Department of Utility Services recommends approval <br />of the above -listed project, in order that they may proceed with the <br />design engineering work in preparation for the special assessment <br />project. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Scurlock, the Board unanimously approved <br />the project for water service in Floridacres <br />Subdivision, as set out in the above staff <br />recommendation. <br />WATER MAIN EXTENSION GROWTH PLAN - PHASE I - WATER SERVICE <br />ASSESSMENT PROJECT <br />The Board reviewed the following memo dated 10/16/91: <br />DATE: <br />TO: <br />I <br />FROM: <br />PREPARED <br />AND STAFFED <br />BY: <br />SUBJECT: <br />OCTOBER 1, 1991 <br />JAMES E. CHANDLER <br />COUNTY ADMINISTRATO <br />TERRANCE G. PINTO /I <br />0 <br />DIRECTOR OF UTIL SERVICES <br />JAMES D. CHASTAIN���� <br />MANAGER OF ASSESS PR�JEc;TS <br />DEPARTMENT OF UTI SERVICES <br />WATER MAIN EXTENSION GROWTH PLAN - PHASE I <br />WATER SERVICE ASSESSMENT PROJECT <br />INDIAN RIVER COUNTY PROJECT NO. UW -91 -02 -DS <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.