My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/19/1991
CBCC
>
Meetings
>
1990's
>
1991
>
11/19/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:47:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/19/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1) Board of County Commissioners' approval for the in-house _ <br />design of water transmission lines from Hobart Park to <br />State Road 512, to serve the North County Middle and High <br />Schools. This item included an explanation of the <br />necessity of the North County Water Plant facility to <br />provide fireflow to these facilities (see attached agenda <br />item and minutes approved on August 13, 1991). As can be <br />seen from this agenda.item, this project must be expedited <br />due to the proposed construction schedule for the North <br />County High School. <br />2) Board of County Commissioners' approval for the design of <br />the North County Water Distribution System with Post, i <br />Buckley, Schuh and Jernigan (see attached agenda item and <br />minutes approved on November 6, 1990). <br />3) Board of County Commissioners' approval of Phase I of the <br />North County Water Distribution System with Post, Buckley, <br />Schuh and Jernigan. This project was a stop -gap measure <br />to interconnect several package water plants on U.S. <br />Highway 1, with the intention_ of taking them off-line <br />as soon as a North County water facility could be <br />constructed (see attached agenda item and minutes approved <br />on September 25, 1990). <br />We have now completed negotiations with our water plant consultant, <br />Camp Dresser and McKee Inc., for Phase I of the North County WTP <br />(see attached scope of services and work authorization). <br />ANALYSIS: r <br />The first phase of the North County WTP will mainly consist of the <br />following: <br />1) 2 million gallon prestressed concrete ground storage tank <br />2) Pumping station with booster pumps, piping, tank, chlorine <br />room, etc. <br />3) Emergency generator and associated fuel storage <br />_ 4) Water main connections, instrumentation, and associated j <br />electrical work <br />The intent of this contract is not only to provide the above -listed <br />facilities, but also to perform the preliminary engineering design <br />report for the entire facility, and complete all associated <br />permitting relative to the plant (i.e., brine discharge, DER, and <br />site plan approval). After these tasks are completed, we intend to <br />come back to the Board with a final design and construction contract <br />for the whole facility. For a full understanding of the scope of <br />this project, please see the attached scope of services and work <br />authorization with Camp Dresser and McKee Inc. <br />The total estimated construction cost of Phase I of this project is <br />$2,037,180.00, with engineering costs as follows: <br />1) Site planning for Hobart Park R.O. Plant $ 53,021.00 <br />with all associated permitting for site <br />plan approval <br />2) Preliminary engineering for Phase I 27,300.00 <br />of this facility <br />3) Final design, bidding, and general 142,600.00* <br />services during construction (7% of <br />construction costs) <br />59 <br />BOOK 800' <br />NOV 19 1993 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.