My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/26/1991
CBCC
>
Meetings
>
1990's
>
1991
>
11/26/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:11 PM
Creation date
6/16/2015 10:48:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/26/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Off' 26 is, <br />B00K6 FriU � iL4 <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Eggert, the Board unanimously granted <br />the second extension of the Land Development Permit <br />for the Grand Harbor Golf & Grounds Maintenance <br />Facility, with the conditions set out in the above <br />staff recommendation. <br />(DEVELOPER'S AGREEMENT AND CONTRACT FOR CONSTRUCTION OF REQUIRED <br />IMPROVEMENTS ON FILE IN THE OFFICE OF CLERK TO THE BOARD) <br />GIFFORD TOWER REFURBISHMENT - CHANGE ORDER NO. 1 <br />The Board reviewed the following memo dated 11/18/91: <br />DATE: NOVEMBER 18, 1991 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI Y VICE <br />PREPARED NOEL J. McMAHON <br />AND STAFFED ENVIRONMENTAL SPECIALI T <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: GIFFORD TOWER REFURBISHMENT <br />CHANGE ORDER NO. 1 <br />IRC PROJECT NO. UW -91 -09 -UW <br />BACKGROUND <br />The Board of County .Commissioners, on October 19, 1991, approved the <br />awarding of the bid for Gifford Tower Refurbishment to Hi -Line <br />Contractors. The amount of bid was $47,500.00. The amount budgeted <br />for this project was $72,000.00. The refurbishment covered the <br />cleaning, blasting and painting of the water tower; no repairs were <br />included. This water tower was last inspected on July 20, 1989, and <br />the only repairs recommended at that time were sandblasting and <br />painting. Due to unexpected accelerated corrosion and weathering, <br />additional repairs are now required. <br />ANALYSIS <br />Hi -Line Contractors moved onto the site on November 7, 1991, and <br />started work. An inspection was made of the- water tower on November <br />12, 1991, by the contractor and one of Howie Green's inspectors. Howie <br />Green is under contract with the County to inspect the Gifford Tower <br />Refurbishment for the County. <br />As a result of this inspection, it was determined that additional <br />extensive repairs are required. These repairs include replacing the <br />top set of six needle rods, replacing the top vent and screen, and <br />repairs to the ladder and catwalk around -the tank, as set forth in the <br />attached bid. The ladder and most of the catwalk are unsafe to use at <br />this time. The cost of these repairs is $21,900.00. (See attached <br />change order.) <br />The contractor has sandblasted and installed the first coat of paint to <br />the inside of the tank. The second and third coats of paint must be <br />_ applied within 14 days of the application of the first coat. <br />If the repairs to the catwalk and vent can be completed before the 14 <br />day window is closed, the damage to the interior first coat can be <br />repaired on a time and material basis plus 10%, not to exceed <br />$2,500.00. This would make the total increase of the change order <br />$24,400.00. <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.