My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/14/1992
CBCC
>
Meetings
>
1990's
>
1992
>
1/14/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 10:54:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/14/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation <br />The subject property has access from 8th Street, which is <br />classified as a collector road on the future roadway thoroughfare <br />plan map. This segment of 8th Street 'is a two-lane paved road with <br />approximately one hundred (100) feet of existing public road right- <br />of-way. <br />Utilities and Services <br />The site is within the Urban <br />available to the site from <br />Wastewater service for the site <br />Wastewater Plant. <br />Environment <br />Service Area. Water service is <br />the South County Water Plant. <br />is available from the West County <br />The subject property is located within flood zone AE as identified <br />by Flood Insurance Rating Maps (FIRM). The north t3.5 acres of the <br />Property is old citrus grove. The remaining t9 acres is old <br />pasture, with a t.75 acre isolated freshwater wetland on the <br />central portion of the property. An upland vegetative fringe <br />exists along the north boundary line. <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the <br />application will be presented. The analysis will include a <br />description of: <br />O concurrency of public facilities <br />O compatibility with the surrounding area <br />O consistency with the comprehensive plan <br />O potential impact on environmental quality <br />This section will also consider alternatives for development of the <br />site. <br />Concurrency of Public Facilities <br />The site is located within the county Urban Service Area (USA), an <br />area deemed suited for urban scale development. The Comprehensive <br />Plan establishes standards for: Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation (Future Land Use <br />Policy 3.1). The -adequate provision of these services is necessary <br />to ensure the continued quality of life enjoyed by the community. <br />The Comprehensive Plan also requires that new development be <br />reviewed to ensure that the minimum adopted level of service <br />standards for -these services and facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no <br />development shall be approved unless it is consistent with the <br />concurrency management system component of the Capital. improvements <br />Element. For comprehensive plan amendments or rezoning requests, <br />conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of <br />each facility with respect to a proposed project. Since <br />comprehensive plan amendments and rezoning requests are not <br />projects, county regulations call for the concurrency review to be <br />based upon the most intense use of'the subject property based upon <br />the requested zoning district or land use designation. For <br />residential rezoning requests, the most intense use (according to <br />the county's LDR's) is the maximum number of units that could be <br />built on the site, given the size of the property and the maximum <br />density under the proposed land use designation. The site <br />information used for the concurrency analysis is as follows: <br />49 <br />J A i�l 14 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.