My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/21/1992
CBCC
>
Meetings
>
1990's
>
1992
>
1/21/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 10:57:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/21/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The in-house design to extend the water main from the intersection of <br />South Winter Beach Road (65th Street) and C.R. 505A (Kings Highway) to <br />C.R. 512 through C.R. 510 supplying North County Middle and High <br />Schools is 90% complete. <br />The proposed water main will be extended from the water main for the <br />middle and high schools at the intersection of C.R. 510 and C.R. 512 <br />through Roseland Road to the Roseland area. <br />ANALYSIS <br />The project will be divided into the following two phases: <br />Phase I: Interconnecting water main from River's Edge Subdivision <br />to Riverwalk Shopping Center in the southeastern corner of <br />the intersection of Roseland Road with U. S. #1. Also, <br />extension of the water main from Riverwalk Shopping Center <br />to Humana Hospital to the north and Roseland Plaza to the <br />east. This phase is proposed as an in-house design. <br />Phase II: Extending the water main at the intersection of C.R. 510 <br />and C.R. 512; to be connected to the water main of Phase I <br />at River's Edge Subdivision. This phase also is proposed <br />as an in-house design. - <br />The preliminary estimated cost for each phase is as follows: <br />Phase I $ 510,270.00 <br />Phase II $ 953,320.00 <br />Total $1,463,590.00 <br />*See attachment A <br />Five proposals for surveying were submitted and listed as follows: <br />Masteller and Moler included included 10,400.00 <br />Note: All submitted proposals are available for public review. <br />This project will be funded from water impact fees. <br />Post, Buckley, Schuh and Jernigan, Inc. (PBS&J), in their water master <br />plan, has sized the water tower capacity based on fire flow <br />requirements for the area. They also have located the best site for <br />the tower based on the ground elevation, direction of flight, etc. <br />Also, the staff has asked the Planning and Zoning Department for their <br />opinion of the requirements and feasibility for several possible sites <br />in the Roseland area. Based on the opinion of the Planning and Zoning <br />Department and the recommendation of PBS&J, the staff will select the <br />site for the water tower. <br />39 <br />JAN 211992 GOOK FI,c 9�3 <br />Phase I & III <br />Phase II <br />Total <br />Kimball/Lloyd and Assoc. <br />$12,420.00 <br />$18,740.00 <br />$31,160.00 <br />H. F. Lenz <br />3,333.00 <br />8,667.00 <br />12,000.00 <br />Carter & Assoc. <br />5,880.00 <br />8,232.00 <br />14,112.00 <br />Kimley-Horn <br />18,750.00 <br />18,750.00 <br />37,500.00 <br />Masteller and Moler included included 10,400.00 <br />Note: All submitted proposals are available for public review. <br />This project will be funded from water impact fees. <br />Post, Buckley, Schuh and Jernigan, Inc. (PBS&J), in their water master <br />plan, has sized the water tower capacity based on fire flow <br />requirements for the area. They also have located the best site for <br />the tower based on the ground elevation, direction of flight, etc. <br />Also, the staff has asked the Planning and Zoning Department for their <br />opinion of the requirements and feasibility for several possible sites <br />in the Roseland area. Based on the opinion of the Planning and Zoning <br />Department and the recommendation of PBS&J, the staff will select the <br />site for the water tower. <br />39 <br />JAN 211992 GOOK FI,c 9�3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.