My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1992
CBCC
>
Meetings
>
1990's
>
1992
>
1/28/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 11:02:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/28/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Director Pinto admitted that this buffering would not control <br />the odor but would put some space between the plants and the <br />residential. <br />In answer to Commissioner Scurlock's inquiry on obtaining <br />clear title, Administrator Chandler assured him that this would be <br />handled the same as any other property the County acquires; if we <br />cannot get clear title, we simply don't close. <br />After another round of lengthy debate on the advantages and <br />disadvantages of acquiring additional land, Commissioner Bird felt <br />the two main questions on the price and the need had been <br />addressed. He didn't feel that the prices were out of line, but as <br />far as whether we need to.acquire and whether it would be prudent <br />for us in the long haul, he really has to rely heavily on staff, <br />and they are recommending the purchase of the additional property. <br />VICE CHAIRMAN BOWMAN CALLED FOR THE QUESTION. The <br />Motion to approve the purchase as recommended by <br />staff failed by a vote of 2-2, Commissioners <br />Scurlock and Bowman dissenting. <br />SOUTH COUNTY WASTEWATER COLLECTION SYSTEM AND REUSE WATER <br />TRANSMISSION SYSTEM - PRELIMINARY ENGINEERING DESIGN AND WORK <br />AUTHORIZATION NO. 2 <br />The Board reviewed the following memo dated 1/15/92: <br />DATE: JANUARY 15, 1992 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILIT SERVICES <br />PREPARED ROBERT O. WISEMEN, P.E. -K) <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: PRELIMINARY ENGINEERING DESIGN AND WORK AUTHORIZATION <br />NO. 2 — SOUTH COUNTY WASTEWATER COLLECTION SYSTEM AND <br />REUSE WATER TRANSMISSION SYSTEM <br />INDIAN RIVER COUNTY PROJECT NO. IIS-90-25-CS/ED- <br />On July 16, 1991, the Board of County Commissioners authorized the <br />firm of Camp Dresser & McKee Inc., to engage in the design, <br />permitting, project administration, and inspection of the South <br />County Wastewater Treatment Plant Project (Work Authorization No. <br />1). The Department of Utility Services has developed a scope of <br />services (Work Authorization No. 2) for the consultant to analyze <br />the existing collection system. The existing collection system will <br />later be redirected to the proposed location of the new WWTP <br />facility at Oslo Road (9th Street, SW). <br />81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.