My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1992
CBCC
>
Meetings
>
1990's
>
1992
>
1/28/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 11:02:15 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/28/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A h I <br />ANALYSIS <br />In Task 100, the existing collection system shall be analyzed as to <br />its pump and pipe size. It also will be redefined by route and <br />direction of flow to deliver the wastewater flow to the south. <br />Simultaneously, the consultant will work on planning and the , <br />preliminary design of the disposal/reuse water transmission main. <br />The possibility of an agreement with the City of Vero Beach, as a - <br />potential large user, to receive the reuse water will be <br />investigated and is a part of this Work Authorization in Task 200. <br />Task 300 - Special Meetings, which requires the:;:consultant as a <br />technical specialist, is proposed in this Work Authorization with an <br />upper limit on an as needed basis. <br />Task -100 and 200 (Cost element No. 1) $45,260.00 <br />Task 300, as needed basis with upper limit 5.000.0o <br />Total requested for approval $5 <br />0,260.00 <br />This study shall be funded through sewer impact fees. This <br />collection and disposal system would not be duplicated in the Master <br />Plan. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends the <br />approval of Work Authorization 2 and authorizes the chairman of the <br />Board of County Commissioners to execute the engineering agreement <br />with Camp Dresser & McKee Inc. <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Scurlock, the Board unanimously (4-0, <br />Commissioner Eggert having left the room <br />temporarily) approved Engineering Services Work <br />Authorization No. 2 with Camp Dresser & McKee, Inc., <br />as recommended by staff. <br />ENGINEERING SERVICES WORK AUTHORIZATION NO. 2 IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />REMOVAL OF ROSELAND PLAZA WASTEWATER TREATMENT PLANT <br />The Board reviewed the following memo dated 1/16/92: <br />_z <br />DATE: JANUARY 16, 1992 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI VICES <br />STAFFED AND <br />PREPARED BY: NOEL J. <br />ENVIROAL SPECIALIST <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: REMOVAL OF ROSELAND PLAZA WASTEWATER TREATMENT PLANT <br />82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.