My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/25/1992
CBCC
>
Meetings
>
1990's
>
1992
>
2/25/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:30 PM
Creation date
6/16/2015 11:09:08 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Indian River County Courthouse Proiect, Asbestos Abatement <br />Contract - Change Order No. 2 <br />The Board reviewed memo from General Services Director Sonny <br />Dean dated February 17, 1992: <br />DATE: FEBRUARY 17, 1992 <br />TO: HONORABLE BOARD OF COUNTY COMMISSIONERS <br />THRU: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: H.T. "SONNY" DEAN, DIRECTO <br />DEPARTMENT OF GENERAL SERVO <br />SUBJECT: INDIAN RIVER COUNTY COURTHOUSE PROJECT <br />ASBESTOS ABATEMENT CONTRACT - CHANGE ORDER NO. 2 <br />BACKGROUND: <br />During the abatement process of the building located at 1535 21st <br />Street, an enormous amount of asbestos material was discovered on the <br />inside of walls. This was caused from "over spray" while insulating <br />the ceiling during construction of the building. Due to the location <br />of the material it was not discovered during the initial inspection. <br />A cost of $151900.00 was incurred to abate the material and dispose <br />of it as specified by law. <br />In order not to hold up the asbestos abatement contractor and the <br />demolition contractor, staff made the determination to authorize this <br />work on an emergency basis. <br />During the abatement of the old WGYL Building it was learned that <br />certain floor tile was not required to be removed and disposed of as <br />hazardous material. This amounted to a credit of $3,602.80 on the <br />authorized contract. <br />RECOMMENDATIONS: <br />Staff recommends Board approval of the attached change order with a <br />net increase of $12,297.20 to the original contract, and requests <br />authorization for the Chairman to execute the applicable documents. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />and authorized the Chairman to execute Change Order <br />No. 2 to the original contract with Kimmins <br />Contracting Corporation, Inc., resulting in a net <br />increase of $12,297.20, as recommended by staff. <br />SAID CHANGE ORDER IS ON FILE IN THE OFFICE OF <br />CLERK TO THE BOARD <br />7 <br />FEB 25' jgl��j <br />b p'� <br />BOOK <br />
The URL can be used to link to this page
Your browser does not support the video tag.