My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment wrongly supplied, and making good <br />any damage to property. <br />5. Other overhead or general expense <br />costs of any kind and the costs of any item not <br />specifically and expressly included in <br />paragraphs 11.01.A and 11.01.B. <br />C. CONTRACTOR's Fee: When all the Work is <br />performed on the basis of cost-plus, CONTRACTOR's <br />fee shall be determined as set forth in the Agreement. <br />When the value of any Work covered by a Change <br />Order or when a Claim for an adjustment in Contract <br />Price is determined on the basis of Cost of the Work, <br />CONTRACTOR's fee shall be determined as set forth <br />in paragraph 12.01.C. <br />D. Documentation: Whenever the Cost of the <br />Work for any purpose is to be determined pursuant to <br />paragraphs 11.01.A and 11.01.B, CONTRACTOR will <br />establish and maintain records thereof in accordance <br />with generally accepted accounting practices and <br />submit in a form acceptable to ENGINEER an <br />itemized cost breakdown together with supporting <br />data. <br />11.02 Cash Allowances <br />A. It is understood that CONTRACTOR has in- <br />cluded in the Contract Price all allowances so named <br />in the Contract Documents and shall cause the Work <br />so covered to be performed for such sums as may be <br />acceptable to OWNER and ENGINEER. <br />CONTRACTOR agrees that <br />1. the allowances include the cost to <br />CONTRACTOR (less any applicable trade <br />discounts) of materials and equipment required <br />by the allowances to be delivered at the Site, <br />and all applicable taxes; and <br />2. CONTRACTOR's costs for unloading <br />and handling on the Site, labor, installation <br />costs, overhead, profit, and other expenses <br />contemplated for the allowances have been <br />included in the Contract Price and not in the <br />allowances, and no demand for additional <br />payment on account of any of the foregoing will <br />be valid. <br />B. Prior to final payment, an appropriate Change <br />Order will be issued as recommended by ENGINEER <br />to reflect actual amounts due CONTRACTOR on <br />account of Work covered by allowances, and the Con- <br />tract Price shall be correspondingly adjusted. <br />11.03 Unit Price Work <br />A. Where the Contract Documents <br />all or part of the Work is to be Unit Price <br />the Contract Price will be deemed to i <br />Unit Price Work an amount equal to the <br />unit price for each separately identified <br />Price Work times the estimated quantity <br />as indicated in the Agreement. Th <br />quantities of items of Unit Price Work ar <br />teed and are solely for the purpose of c <br />Bids and determining an initial Contract <br />minations of the actual quantities and cla- <br />Unit Price Work performed by CONTRA <br />made by ENGINEER subject to the <br />paragraph 9.08. <br />provide that <br />ork, initially <br />clude for all <br />sum of the <br />item of Unit <br />f each item <br />estimated <br />not guaran- <br />mparison of <br />rice. Deter- <br />sifications of <br />TOR will be <br />rovisions of <br />• <br />41 <br />1 <br />• <br />B. Each unit price will be deemed t <br />amount considered by CONTRACTOR <br />quate to cover CONTRACTOR's overhe. <br />for each separately identified item. <br />include an <br />to be ade- <br />d and profit <br />C. OWNER or CONTRACTOR may make a <br />Claim for an adjustment in the Contract P ice in accor- <br />dance with paragraph 10.05 it <br />1. the quantity of any item <br />Work performed by CONTRAC <br />materially and significantly from t <br />quantity of such item indicat <br />Agreement and <br />f Unit Price <br />OR differs <br />e estimated <br />-d in the <br />2. there is no correspondin • adjustment <br />with respect any other item of Work, and <br />3. if CONTRACTOR be ieves that <br />CONTRACTOR is entitled to an increase in <br />Contract Price as a result of hav ng incurred <br />additional expense or OWNER •-lieves that <br />OWNER is entitled to a decrease in Contract <br />Price and the parties are unable to agree as to <br />the amount of any such increase or decrease. <br />ARTICLE 12 - CHANGE OF CONTRACT PRICE; <br />CHANGE OF CONTRACT TIMES <br />12.01 Change of Contract Price <br />A. The Contract Price may only be c anged by a <br />Change Order or by a Written Amend ent. Any <br />Claim for an adjustment in the Contract P .ce shall be <br />based on written notice submitted by the •_rty making <br />the Claim to the ENGINEER and the other party to the <br />Contract in accordance with the provisio s of para- <br />graph 10.05. <br />B. The value of any Work covered b a Change <br />Order or of any Claim for an adjus ent in the <br />Contract Price will be determined as follow.. <br />00700 - General Condition- REV 5-10-13.doc <br />00700 - 33 <br />F:1Public WorksIENGINEERING DIVISION PROJECTSI1314-107th Ave Milling90th St to 94th St Admin\bid documentsWMaster Contract Documents100700 - General Co ditions REV 510- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.