My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Written Amendment. <br />C. Where defective Work (and damage to other <br />Work resulting therefrom) has been corrected or <br />removed and replaced under this paragraph 13.07, <br />the correction period hereunder with respect to such <br />Work will be extended for an additional period of one <br />year after such correction or removal and replacement <br />has been satisfactorily completed. <br />D. CONTRACTOR's obligations under this <br />paragraph 13.07 are in addition to any other obligation <br />or warranty. The provisions of this paragraph 13.07 <br />shall not be construed as a substitute for or a waiver <br />of the provisions of any applicable statute of limitation <br />or repose. <br />13.08 Acceptance of Defective Work <br />A. If, instead of requiring correction or removal <br />and replacement of defective Work, OWNER (and, <br />prior to ENGINEER's recommendation of final pay- <br />ment, ENGINEER) prefers to accept it, OWNER may <br />do so. CONTRACTOR shall pay all Claims, costs, <br />losses, and damages (including but not limited to all <br />fees and charges of engineers, architects, attorneys, <br />and other professionals and all court or arbitration or <br />other dispute resolution costs) attributable to <br />OWNER's evaluation of and determination to accept <br />such defective Work (such costs to be approved by <br />ENGINEER as to reasonableness) and the diminished <br />value of the Work to the extent not otherwise paid by <br />CONTRACTOR pursuant to this sentence. If any <br />such acceptance occurs prior to ENGINEER's recom- <br />mendation of final payment, a Change Order will be <br />issued incorporating the necessary revisions in the <br />Contract Documents with respect to the Work, and <br />OWNER shall be entitled to an appropriate decrease <br />in the Contract Price, reflecting the diminished value of <br />Work so accepted. If the parties are unable to agree <br />as to the amount thereof, OWNER may make a Claim <br />therefor as provided in paragraph 10.05. If the <br />acceptance occurs after such recommendation, an <br />appropriate amount will be paid by CONTRACTOR to <br />OWNER. <br />13.09 OWNER May Correct Defective Work <br />A. If CONTRACTOR fails within a reasonable <br />time after written notice from ENGINEER to correct <br />defective Work or to remove and replace rejected <br />Work as required by ENGINEER in accordance with <br />paragraph 13.06.A, or if CONTRACTOR fails to <br />perform the Work in accordance with the Contract <br />Documents, or if CONTRACTOR fails to comply with <br />any other provision of the Contract Documents, <br />OWNER may, after seven days writte notice to <br />CONTRACTOR, correct and remedy any such <br />deficiency. <br />B. In exercising the rights and rem <br />this paragraph, OWNER shall proceed e <br />In connection with such corrective a <br />action, OWNER may exclude CONTRAC <br />or part of the Site, take possession of all • <br />Work and suspend CONTRACTOR's se <br />thereto, take possession of CONTRAC <br />appliances, construction equipment and <br />the Site, and incorporate in the Work all m <br />equipment stored at the Site or for which • <br />paid CONTRACTOR but which are stored <br />CONTRACTOR shall allow OWNER, <br />representatives, agents and employees, <br />other contractors, and ENGINEER and E <br />Consultants access to the Site to enable <br />exercise the rights and remedies <br />paragraph. <br />-dies under <br />peditiously. <br />d remedial <br />OR from all <br />r part of the <br />ices related <br />OR's tools, <br />achinery at <br />terials and <br />WNER has <br />elsewhere. <br />OWNER's <br />OWNER's <br />GINEER's <br />•WNER to <br />nder this <br />C. All Claims, costs, losses, an. damages <br />(including but not limited to all fees and charges of <br />engineers, architects, attorneys, and other <br />professionals and all court or arbitratio or other <br />dispute resolution costs) incurred or s stained by <br />OWNER in exercising the rights and remedies under <br />this paragraph 13.09 will be charged ag : inst CON- <br />TRACTOR, and a Change Order will be issued <br />incorporating the necessary revisions in t e Contract <br />Documents with respect to the Work; an. OWNER <br />shall be entitled to an appropriate decr-ase in the <br />Contract Price. If the parties are unable to :gree as to <br />the amount of the adjustment, OWNER ay make a <br />Claim therefor as provided in paragraph 10.05. Such <br />claims, costs, losses and damages will incl de but not <br />be limited to all costs of repair, or replacem-nt of work <br />of others destroyed or damaged by correction, <br />removal, or replacement of CONT • CTOR's <br />defective Work. <br />D. CONTRACTOR shall not be -(lowed an <br />extension of the Contract Times (or ilestones) <br />because of any delay in the performance .f the Work <br />attributable to the exercise by OWNER of OWNER's <br />rights and remedies under this paragraph 1 .09. <br />ARTICLE 14 - PAYMENTS TO CONTRA TOR AND <br />COMPLETION <br />14.01 Schedule of Values <br />A. The schedule of values established <br />ed in paragraph 2.07.A will serve as the <br />progress payments and will be incorpor <br />form of Application for Payment acceptabl <br />00700 - General Conditions <br />as provid- <br />basis for <br />ed into a <br />to ENGI- <br />EV 5-10-13.doc <br />00700 - 37 <br />F:1Public WorksIENGINEERING DIVISION PROJECTS11314-107th Ave Milling_90th St to 94th StlAdmin\bid documents Master Contract Documents \00700 - General Gond tions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.