My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Indian River County, Florida <br />b. NONE <br />c. <br />SC -5.07 Waiver of Rights <br />SC -5.07 Delete GC -5.07 (paragraphs A, B, and C) in its entirety. <br />SC -5.08 Receipt and Application of Insurance Proceeds <br />SC -5.08 Delete GC -5.08 (paragraphs A and B) in its entirety. <br />SC -5.09 Acceptance of Bonds and Insurance; Option to Replace <br />SC -5.09 Delete GC-5.09(paragraph A) in its entirety. <br />SC -6.02 Labor; Working Hours <br />SC -6.02.B. Add the following paragraphs immediately after paragraph GC -6.02.B: <br />1. 1. Regular working hours are defined as Monday through Friday, e cluding <br />Indian River County Holidays, from 7 a.m. to 5 p.m. <br />2. 2. Indian River County Holidays are: New Year's Day, Good Friday, emorial <br />Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day Friday <br />after Thanksgiving, Christmas Day and the day after Christmas. Wo ing on <br />these days will not be permitted without prior written permission and -pproval <br />from the Construction Coordination Manager. <br />3. 3. The CONTRACTOR shall receive no additional compensation for •vertime <br />work, i.e., work in excess of eight hours in any one calendar day or 40 ours in <br />any one calendar week, even though such overtime work may be require • under <br />emergency conditions and may be ordered by the ENGINEER in writing. <br />4. 4. All costs of inspection and testing performed during overtime wor by the <br />CONTRACTOR, which is allowed solely for the convenience of the <br />CONTRACTOR, shall be borne by the CONTRACTOR, and a credit given to the <br />OWNER to deduct the costs of all such inspection and testing frim any <br />payments otherwise due the CONTRACTOR. <br />5. 5. All costs of OWNER's employees and costs of ENGINEER's Co sultant <br />resulting from overtime work by the CONTRACTOR, which is allowed s•lely for <br />the convenience of the CONTRACTOR, shall be borne by the CONT- CTOR, <br />and a credit given to OWNER to deduct all such costs from any p• yments <br />otherwise due the CONTRACTOR. <br />6. No work shall commence before 7 a.m. or continue after 5 p.m. except in case of <br />emergency upon specific permission of the ENGINEER. <br />SC -6.06 Concerning Subcontractors, Suppliers, and Others <br />SC -6.06.C. Add the following sentence at the end of paragraph GC -6.06.C: <br />OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other indi'iidual or <br />entity, to the extent practicable, information about amounts paid to CONTRAC OR on <br />account of Work performed for CONTRACTOR by a particular Subcontractor, Su plier, or <br />other individual or entity. <br />SC -6.08 Permits <br />00800-6 <br />00800 - Supplementary Conditions 0513 rev.doc <br />rk <br />00800 6F:\Public Wos\ENGINEERING DIVISION PROJECTS\1314107th Ave Milling90th St to 94th St\Admin\bid documents\Master Contract Documents 0800 0800 - <br />Suoolementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.