My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -6.08 Add the following paragraphs immediately after paragraph GC -6.08.A: <br />1. The OWNER has obtained the following permits (copies of these permits : re <br />contained in Appendix "A"): No Permits Required <br />2. The CONTRACTOR shall obtain and pay for all other required permits an <br />licenses. The CONTRACTOR shall provide copies of the permits to the <br />OWNER and ENGINEER and shall comply with all conditions contained i <br />the permits at no extra cost to the OWNER. <br />3. The CONTRACTOR shall be familiar with all permit requirements during <br />construction and shall be responsible for complying with these <br />requirements. The cost of this effort shall be included in the pay item in <br />which the work is most closely associated with. <br />SC -11.01 Cost of the Work <br />8 <br />SC -11.01.A.1. Delete paragraph GC -11.01.A.1 in its entirety, and insert the following se tences <br />in its place: <br />1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br />(see SC -2.06.B) for the additional or unforeseen work. Labor includes oremen <br />actually engaged in the work; and will not include project supervisory perso nel nor <br />necessary on-site clerical staff, except when the additional or unforeseen ork is a <br />controlling work item and the performance of such controlling work item actually <br />extends completion of the project due to no fault of the Contractor. Comp nsation <br />for project supervisory personnel, but in no case higher than a Project M : nager's <br />position, shall only be for the pro -rata time such supervisory personnel pent on <br />the contract. In no case shall an officer or director of the Company, nDr those <br />persons who own more than 1% of the Company, be considered a- project <br />supervisory personnel, direct labor or foremen hereunder. The expenses of <br />performing Work outside of regular working hours, on Saturday, Sunday, or legal <br />holidays, shall be included in the above to the extent authorized by OWNE <br />SC -13.03 Test and Inspections <br />SC -13.03.B. Delete paragraph GC -13.03.8 in its entirety, and insert the following sent-nces in <br />its place: <br />B. OWNER shall employ and pay for the services of an independent testing labo atory to <br />perform all initial inspections, tests, or approvals required by the Contract Do uments <br />except those inspections, tests, or approvals listed immediately below. Su•sequent <br />inspections, tests, or approvals required after initial failing inspections, t-sts, or <br />approvals shall be paid for by the CONTRACTOR by back charge to su•sequent <br />applications for payment. The CONTRACTOR shall arrange, obtain, and pa for the <br />following inspections, tests, or approvals: <br />1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br />below; <br />2. costs incurred in connection with tests or inspections conducted pursuan to <br />paragraph 13.04.6 shall be paid as provided in said paragraph 13.04.B; <br />3. tests otherwise specifically provided in the Contract Documents. <br />00800-7 <br />00800 - Supplementary Conditions 0 13 rev.doc <br />00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling90th St to 94th St\Admin\bid documents Master Contract Documents .0800 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.