Laserfiche WebLink
f. OWNER has been required to pay an independent testing labora ory for <br />subsequent inspections, tests, or approvals taken after initial failing insp ctions, <br />tests, or approvals. <br />SC -14.02.C.1. Delete paragraph GC -14.02.C. 1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER to CONTRACTOR according to th- Local <br />Government Prompt Payment Act. F.S. 218.70 et. seq. <br />SC -14.04 Substantial Completion <br />SC -14.04A. After the third sentence in paragraph GC -14.04A of the General Co ditions, <br />delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br />"If Engineer considers the Work substantially complete, Engineer will <br />and deliver to Owner a tentative certificate of Substantial Completion that <br />the date of Substantial Completion. In accordance with the provisions o <br />Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certi <br />Substantial Completion from Engineer, the Owner, the Engineer, <br />Contractor shall conduct a walk-through inspection of the Project to doc <br />list of any items required to render the Work on the Project c <br />satisfactory, and acceptable under this Agreement (herein the "Statuto <br />The Statutory List shall be reduced to writing and circulated among the <br />the Engineer, and the Contractor by the Owner or the Engineer w <br />calendar days after substantial completion. The Owner and C• <br />acknowledge and agree that: 1) the failure to include any corrective <br />pending items that are not yet completed, on the Statutory List does not <br />responsibility of the Contractor to complete all of the Work under this Agr <br />2) upon completion of all items on the Statutory List, the Contractor may <br />pay request for all remaining retainage except as otherwise set fort <br />Agreement; and 3) any and all items that require correction under this Ag <br />and that are identified after the preparation of the Statutory List re <br />obligation of the Contractor to complete to the Owner's satisfaction u <br />Agreement. After receipt of the Statutory List by the Contractor, the C <br />acknowledges and agrees that it will diligently proceed to complete all i <br />the Statutory List and schedule a final walk-through in anticipation <br />completion on the Project." <br />• <br />SC -14.04B Add the following new paragraph immediately after paragraph GC 14.048: <br />C. At the time of delivery of the tentative certificate of Substantial Completion, Engi <br />deliver to Owner and Contractor a written recommendation as to division of respo <br />pending final payment between Owner and Contractor with respect to security, o <br />safety, and protection of the Work, maintenance, heat, utilities, insurance, and warra <br />guarantees <br />SC -14.07 Final Payment <br />SC -14.07.C.1. Delete paragraph GC -14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />00800-9 <br />•repare <br />shall fix <br />Florida <br />icate of <br />nd the <br />ment a <br />mplete, <br />List"). <br />Owner, <br />thin 30 <br />ntractor <br />ork, or <br />Iter the <br />-ement; <br />ubmit a <br />in this <br />eement <br />ain the <br />der this <br />ntractor <br />ems on <br />of final <br />eer will <br />sibilities <br />aeration, <br />ties and <br />00800 - Supplementary Conditions 0 -13 rev.doc <br />00800 9F:\Public Works\ENGINEERING DIVISION PROJECTS\1314107th Ave Milling90th St to 94th St\Admin\bid documents Master Contract Documents\'0800 - <br />