My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01310 <br />CONSTRUCTION SCHEDULES <br />1.1 GENERAL REQUIREMENTS <br />A. No partial payments shall be approved by the ENGINEER until they- is an <br />approved construction progress schedule on hand. <br />B. Designate an authorized representative who shall be responsible fo <br />development and maintenance of the schedule and of all progress <br />payment reports. This representative shall have direct project cont <br />complete authority to act on behalf of the CONTRACTOR in fulfillin <br />commitments of the CONTRACTOR's schedules. <br />1.2 REVISIONS TO THE CONSTRUCTION SCHEDULES <br />nd <br />oI and <br />the <br />When the ENGINEER requires the CONTRACTOR to submit revised (updated) <br />progress schedules on a monthly basis the CONTRACTOR shall: <br />A. Indicate the progress of each activity to the date of submission. <br />B. Show changes occurring since the previous submission listing: <br />1. Major changes in scope. <br />2. Activities modified since the previous submission. <br />3. Revised projections of progress and completion. <br />4. Other identifiable changes. <br />C. Provide a narrative report as needed to define: <br />1. Problem areas, anticipated delays, and the impact on the sc edule. <br />2. Corrective action recommended and its effect. <br />3. The effect of changes on schedules of other prime contracto <br />1.3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br />On or before the tenth day after the effective date of the Agreement, subm t the <br />initial schedules to the ENGINEER. The ENGINEER will review the sched les <br />and return a review copy to the CONTRACTOR within 21 days after receip . If <br />required by the ENGINEER, resubmit revised schedules on or before the <br />seventh day after receipt of the review copy. If required by the ENGINEE <br />submit revised monthly progress schedules with that month's application for <br />payment. <br />01310-1 01310 Construction Sc edule <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling_90th St to 94th St\Admin\bid documents\M-ster <br />Contract Documents\01310 - Construction Schedule.doc <br />