Laserfiche WebLink
1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br />A. After receiving approval by the ENGINEER, distribute copies of the <br />approved initial schedule and all reviewed revisions (updated) to: <br />1. Job site file. <br />2. Subcontractors. <br />3. Other concerned parties. <br />4. OWNER (two copies). <br />5. ENGINEER <br />B. In the cover letter, instruct recipients to report promptly to the <br />CONTRACTOR, in writing, any problems anticipated by the projectio <br />shown in the schedules. <br />+ + END OF SECTION + + <br />s <br />01310-2 01310 Construction Sch=dule <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\bid documents\Mast-r <br />Contract Documents\01310 - Construction Schedule.doc <br />