My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 — Submittal of Shop Drawings <br />M. Upon return of a submittal marked "Revise and Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. The "Not <br />Approved" notation is used to indicate material or equipment that is of <br />acceptable. Upon return of a submittal so marked, repeat the initial <br />approval procedure utilizing acceptable material or equipment. <br />N. Any related Work performed or equipment installed without an "App oved" <br />or "Approved as Corrected" Shop Drawing will be at the sole responibility <br />of the CONTRACTOR. <br />O. Submit Shop Drawings well in advance of the need for the material I r <br />equipment for construction and with ample allowance for the time re. uired <br />to make delivery of material or equipment after data covering such i <br />approved. CONTRACTOR shall assume the risk for all materials or <br />equipment which is fabricated or delivered prior to the approval of S op <br />Drawings. Materials or equipment will not be included in periodic pr•gress <br />payments until approval thereof has been obtained in the specified <br />manner. <br />P. ENGINEER will review and process all submittals promptly, but a <br />reasonable time should be allowed for this, for the Shop Drawings •eing <br />revised and resubmitted, and for time required to return the approv d <br />Shop Drawings to CONTRACTOR. <br />Q. Furnish required submittals with complete information and accurac in <br />order to achieve required approval of an item within three submittal •.. All <br />costs to ENGINEER involved with subsequent submittals of Shop <br />Drawings, Samples or other items requiring approval, will be back- harged <br />to CONTRACTOR in accordance with the General Conditions and t e <br />Supplementary Conditions. If the CONTRACTOR requests a subst tution <br />for a previously approved item, all of ENGINEER'S costs in the revi -wing <br />and approval of the substitution will be back -charged to CONTRAC OR <br />unless the need for such substitution is beyond the control of <br />CONTRACTOR. <br />+ + END OF SECTION + + <br />01340 - Submittal of Shop D awings.doc <br />01340-6 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St to 94th St\Admin\bid documents\Master Contract <br />Documents\01340 - Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.