Laserfiche WebLink
TABLE OF CONTENTS <br />Title <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />1.01 Defined Terms <br />1.02 Terminology <br />ARTICLE 2 - PRELIMINARY MATTERS <br />2.01 Delivery of Bonds <br />2.02 Copies of Documents <br />2.03 Commencement of Contract Times; Notice to Proceed <br />2.04 Starting the Work <br />2.05 Before Starting Construction <br />2.06 Preconstruction Conference <br />2.07 Initial Acceptance of Schedules <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br />3.01 Intent <br />3.02 Reference Standards <br />3.03 Reporting and Resolving Discrepancies <br />3.04 Amending and Supplementing Contract Documents <br />3.05 Reuse of Documents <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENC <br />POINTS <br />4.01 Availability of Lands <br />4.02 Subsurface and Physical Conditions <br />4.03 Differing Subsurface or Physical Conditions <br />4.04 Underground Facilities <br />4.05 Reference Points <br />4.06 Hazardous Environmental Condition at Site <br />Page <br />5 <br />5 <br />7 <br />8 <br />8 <br />8 <br />8 <br />8 <br />8 <br />9 <br />9 <br />9 <br />9 <br />10 <br />10 <br />10 <br />10 <br />E <br />11 <br />11 <br />11 <br />11 <br />12 <br />13 <br />13 <br />14 <br />14 <br />15 <br />15 <br />15 <br />16 <br />16 <br />17 <br />17 <br />18 <br />18 <br />18 <br />18 <br />18 <br />19 <br />19 <br />19 <br />20 <br />ARTICLE 5 - BONDS AND INSURANCE <br />5.01 Performance, Payment, and Other Bonds <br />5.02 Licensed Sureties and Insurers <br />5.03 Certificates of Insurance <br />5.04 CONTRACTOR's Liability Insurance <br />5.05 OWNER's Liability Insurance <br />5.06 Property Insurance <br />5.07 Waiver of Rights <br />5.08 Receipt and Application of Insurance Proceeds <br />5.09 Acceptance of Bonds and Insurance; Option to Replace <br />5.10 Partial Utilization, Acknowledgment of Property Insurer <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br />6.01 Supervision and Superintendence <br />6.02 Labor; Working Hours <br />6.03 Services, Materials, and Equipment <br />6.04 Progress Schedule <br />6.05 Substitutes and "Or -Equals" <br />6.06 Concerning Subcontractors, Suppliers, and Others <br />00700 - General Condition REV 5-10-13.doc <br />00700 - 2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling_90th St to 94th St\Admin\bid documents\Master Contract Documents\00700 - General Conditions <br />V 5-10-13.doc <br />