My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.07 Patent Fees and Royalties <br />6.08 Permits <br />6.09 Laws and Regulations <br />6.10 Taxes <br />6.11 Use of Site and Other Areas <br />6.12 Record Documents <br />6.13 Safety and Protection <br />6.14 Safety Representative <br />6.15 Hazard Communication Programs <br />6.16 Emergencies <br />6.17 Shop Drawings and Samples <br />6.18 Continuing the Work <br />6.19 CONTRACTOR's General Warranty and Guarantee <br />6.20 Indemnification <br />ARTICLE 7 - OTHER WORK <br />7.01 Related Work at Site <br />7.02 Coordination <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />8.02 Replacement of ENGINEER <br />8.03 Furnish Data <br />8.04 Pay Promptly When Due <br />8.05 Lands and Easements; Reports and Tests <br />8.06 Insurance <br />8.07 Change Orders <br />8.08 Inspections, Tests, and Approvals <br />8.09 Limitations on OWNER's Responsibilities <br />8.10 Undisclosed Hazardous Environmental Condition <br />8.11 Evidence of Financial Arrangements <br />ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br />9.01 OWNER'S Representative <br />9.02 Visits to Site <br />9.03 Project Representative <br />9.04 Clarifications and Interpretations <br />9.05 Authorized Variations in Work <br />9.06 Rejecting Defective Work <br />9.07 Shop Drawings, Change Orders and Payments <br />9.08 Determinations for Unit Price Work <br />9.09 Decisions on Requirements of Contract Documents and Acceptability of Work <br />9.10 Limitations on ENGINEER's Authority and Responsibilities <br />ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br />10.01 Authorized Changes in the Work <br />10.02 Unauthorized Changes in the Work <br />10.03 Execution of Change Orders <br />10.04 Notification to Surety <br />10.05 Claims and Disputes <br />ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK <br />11.01 Cost of the Work <br />11.02 Cash Allowances <br />21 <br />22 <br />22 <br />22 <br />22 <br />23 <br />23 <br />23 <br />23 <br />24 <br />24 <br />25 <br />25 <br />25 <br />26 <br />26 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />27 <br />28 <br />28 <br />28 <br />28 <br />28 <br />28 <br />28 <br />29 <br />29 <br />29 <br />29 <br />30 <br />30 <br />30 <br />30 <br />30 <br />30 <br />31 <br />31 <br />33 <br />00700 - General Condition REV 5-10-13.doc <br />00700 - 3 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling 90th St to 94th St\Admin\bid documents\Master Contract Documents \00700 - General Conditions V 5-10-13 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.