My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Drawings—That part of the Contract <br />Documents prepared or approved by ENGINEER <br />which graphically shows the scope, extent, and <br />character of the Work to be performed by <br />CONTRACTOR. Shop Drawings and other <br />CONTRACTOR submittals are not Drawings as so <br />defined. <br />18. Effective Date of the Agreement—The <br />date indicated in the Agreement on which it becomes <br />effective, but if no such date is indicated, it means the <br />date on which the Agreement is signed and delivered <br />by the last of the two parties to sign and deliver. <br />19. ENGINEER—The individual or entity <br />named as such in the Agreement. <br />20. ENGINEER's Consultant An individual or <br />entity having a contract with ENGINEE mish <br />services as ENGINEER's in•- • - sent professional <br />associate or consul - • + respect to the Project and <br />who is '• - - ' ed as such in the Supplementary <br />21. Field Order—A written order issued by <br />ENGINEER which requires minor changes in the <br />Work but which does not involve a change in the <br />Contract Price or the Contract Times. <br />22. General Requirements—Sections of <br />Division 1 of the Specifications. The General <br />Requirements pertain to all sections of the Specifica- <br />tions. <br />23. Hazardous Environmental Condition—The <br />presence at the Site of Asbestos, PCBs, Petroleum, <br />Hazardous Waste, or Radioactive Material in such <br />quantities or circumstances that may present a <br />substantial danger to persons or property exposed <br />thereto in connection with the Work. <br />24. Hazardous Waste—The term Hazardous <br />Waste shall have the meaning provided in Section <br />1004 of the Solid Waste Disposal Act (42 USC <br />Section 6903) as amended from time to time. <br />25. Laws and Regulations; Laws or Regulat- <br />ions—Any and all applicable laws, rules, regulations, <br />ordinances, codes, and orders of any and all govern- <br />mental bodies, agencies, authorities, and courts <br />having jurisdiction. <br />26. Liens—Charges, security interests, or <br />encumbrances upon Project funds, real property, or <br />personal property. <br />27. Milestone—A principal event specified in <br />the Contract Documents relating to an intermediate <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling_90th St <br />13.doc <br />completion date or time prior to Substan ial Comple- <br />tion of all the Work. <br />28. Notice of Award—The writte notice by <br />OWNER to the apparent successful bidde stating that <br />upon timely compliance by the apparen successful <br />bidder with the conditions precedent li -ted therein, <br />OWNER will sign and deliver the Agreem=nt. <br />29. Notice to Proceed—A written <br />by OWNER to CONTRACTOR fixing t <br />which the Contract Times will commenc= <br />on which CONTRACTOR shall start to <br />Work under the Contract Documents. <br />30. OWNER—The individual, e <br />body, or authority with whom CONT <br />entered into the Agreement and for whom <br />to be performed. <br />otice given <br />e date on <br />to run and <br />perform the <br />tity, public <br />CTOR has <br />the Work is <br />31. Partial Utilization—Use by 0 NER of a <br />substantially completed part of the Work for the pur- <br />pose for which it is intended (or a relat-d purpose) <br />prior to Substantial Completion of all the ork. <br />32. PCBs—Polychlorinated biphe yls. <br />33. Petroleum—Petroleum, includ ng crude oil <br />or any fraction thereof which is liquid at standard <br />conditions of temperature and pressure 60 degrees <br />Fahrenheit and 14.7 pounds per -quare inch <br />absolute), such as oil, petroleum, fuel oil, •il sludge, oil <br />refuse, gasoline, kerosene, and oil mixes with other <br />non -Hazardous Waste and crude oils. <br />34. Project—The total constructi•n of which <br />the Work to be performed under e Contract <br />Documents may be the whole, or a pa as may be <br />indicated elsewhere in the Contract Docu ents. <br />35. Project Manual—The bound <br />information prepared for bidding and con <br />Work. A listing of the contents of the Pr <br />which may be bound in one or more <br />contained in the table(s) of contents. <br />36. Radioactive Material—Sour <br />nuclear, or byproduct material as de <br />Atomic Energy Act of 1954 (42 USC Se <br />seq.) as amended from time to time. <br />• <br />ocumentary <br />tructing the <br />'ect Manual, <br />volumes, is <br />e, special <br />ned by the <br />tion 2011 et <br />37. Resident Project Repress ntative—The <br />authorized representative of ENGINEER o may be <br />assigned to the Site or any part thereof. <br />38. Samples—Physical exa pies of <br />materials, equipment, or workmanshi• that are <br />representative of some portion of the Wo and which <br />00700 - General Conditi• s REV 5-10-13.doc <br />00700 - 6 <br />to 94th St\Admin\bid documents\Master Contract Documents \00700 - General C' nditions REV 5-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.