establish the standards by which such portion of the <br />Work will be judged. <br />39. Shop Drawings—All drawings, diagrams, <br />illustrations, schedules, and other data or information <br />which are specifically prepared or assembled by or for <br />CONTRACTOR and submitted by CONTRACTOR to <br />illustrate some portion of the Work. <br />40. Site—Lands or areas indicated in the <br />Contract Documents as being furnished by OWNER <br />upon which the Work is to be performed, including <br />rights-of-way and easements for access thereto, and <br />such other lands furnished by OWNER which are <br />designated for the use of CONTRACTOR. <br />41. Specifications—That part of the Contract <br />Documents consisting of written technical descriptions <br />of materials, equipment, systems, standards, and <br />workmanship as applied to the Work and certain <br />administrative details applicable thereto. <br />42. Subcontractor—An individual or entity <br />having a direct contract with CONTRACTOR or with <br />any other Subcontractor for the performance of a part <br />of the Work at the Site. <br />43. Substantial Completion—The time at <br />which the Work (or a specified part thereof) has <br />progressed to the point where, in the opinion of <br />ENGINEER, the Work (or a specified part thereof) is <br />sufficiently complete, in accordance with the Contract <br />Documents, so that the Work (or a specified part <br />thereof) can be utilized for the purposes for which it is <br />intended. The terms "substantially complete" and <br />"substantially completed" as applied to all or part of the <br />Work refer to Substantial Completion thereof. <br />44. Supplementary Conditions—That part of <br />the Contract Documents which amends or <br />supplements these General Conditions. <br />45. Supplier—A manufacturer, fabricator, <br />supplier, distributor, materialman, or vendor having a <br />direct contract with CONTRACTOR or with any <br />Subcontractor to fumish materials or equipment to be <br />incorporated in the Work by CONTRACTOR or any <br />Subcontractor. <br />46. Underground Facilities—All underground <br />pipelines, conduits, ducts, cables, wires, manholes, <br />vaults, tanks, tunnels, or other such facilities or <br />attachments, and any encasements containing such <br />facilities, including those that convey electricity, gases, <br />steam, liquid petroleum products, telephone or other <br />communications, cable television, water, wastewater, <br />storm water, other liquids or chemicals, or traffic or <br />other control systems. <br />47. Unit Price Work—Work to be paid for on <br />the basis of unit prices. <br />48. Work—The entire completed onstruction <br />or the various separately identifiable part . thereof re- <br />quired to be provided under the Contract Documents. <br />Work includes and is the result of p=rforming or <br />providing all labor, services, and do umentation <br />necessary to produce such cons ction, and <br />furnishing, installing, and incorporating .:II materials <br />and equipment into such construction, all as required <br />by the Contract Documents. <br />49. Work Change Directiv- A written <br />statement to CONTRACTOR issued on or after the <br />Effective Date of the Agreement and signed by <br />OWNER and recommended by ENGINE R ordering <br />an addition, deletion, or revision in th- Work, or <br />responding to differing or unforeseen s bsurface or <br />physical conditions under which the W. rk is to be <br />performed or to emergencies. A Work Change <br />Directive will not change the Contract "rice or the <br />Contract Times but is evidence that the p- riles expect <br />that the change ordered or documented by a Work <br />Change Directive will be incorporated i a subse- <br />quently issued Change Order following neotiations by <br />the parties as to its effect, if any, on the Contract Price <br />or Contract Times. <br />50. Written Amendment -A writte statement <br />modifying the Contract Documents, signed by <br />OWNER and CONTRACTOR on or after e Effective <br />Date of the Agreement and normally dea ing with the <br />non -engineering or nontechnical rather han strictly <br />construction -related aspects of the Con ract Docu- <br />ments. <br />1.02 Terminology <br />A. Intent of Certain Terms or Adjecti <br />1. Whenever in the Contract Do <br />terms "as allowed," "as approved," or t <br />effect or import are used, or the <br />"reasonable," "suitable," "acceptable <br />"satisfactory," or adjectives of like effe <br />are used to describe an action or dete <br />ENGINEER as to the Work, it is intend <br />action or determination will be solely to <br />general, the completed Work for com <br />the requirements of and information in <br />Documents and conformance with <br />concept of the completed Project as a <br />s <br />uments the <br />mis of like <br />adjectives <br />" "proper," <br />t or import <br />ination of <br />d that such <br />evaluate, in <br />• Hance with <br />e Contract <br />the design <br />functioning <br />whole as shown or indicated in the Contract <br />Documents (unless there is a specifi statement <br />indicating otherwise). The use of any uch term or <br />adjective shall not be effective to assi n to ENGI- <br />00700 - General Condition REV 5-10-13.doc <br />00700 - 7 <br />F:1Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling90th St to 94th St\Admin\bid documents\Master Contract Documents\00700 - General Co <br />13.doc <br />ditions REV 5-10- <br />