Laserfiche WebLink
subsurface or physical conditions or performing any <br />Work in connection therewith (except in an emergency <br />as required by paragraph 6.16.A), notify OWNER and <br />ENGINEER in writing about such condition. <br />CONTRACTOR shall not further disturb such <br />condition or perform any Work in connection therewith <br />(except as aforesaid) until receipt of written order to do <br />so. <br />B. ENGINEER's Review: After receipt of written <br />notice as required by paragraph 4.03.A, ENGINEER <br />will promptly review the pertinent condition, determine <br />the necessity of OWNER's obtaining additional <br />exploration or tests with respect thereto, and advise <br />OWNER in writing (with a copy to CONTRACTOR) of <br />ENGINEER's findings and conclusions. <br />C. Possible Price and Times Adjustments <br />1. The Contract Price or the Contract <br />Times, or both, will be equitably adjusted to the <br />extent that the existence of such differing <br />subsurface or physical condition causes an in- <br />crease or decrease in CONTRACTOR's cost <br />of, or time required for, performance of the <br />Work; subject, however, to the following: <br />a. such condition must meet any one or <br />more of the categories described in para- <br />graph 4.03.A; and <br />b. with respect to Work that is paid for <br />on a Unit Price Basis, any adjustment in <br />Contract Price will be subject to the <br />provisions of paragraphs 9.08 and 11.03. <br />2. CONTRACTOR shall not be entitled <br />to any adjustment in the Contract Price or <br />Contract Times it <br />a. CONTRACTOR knew of the <br />existence of such conditions at the time <br />CONTRACTOR made a final commitment <br />to OWNER in respect of Contract Price and <br />Contract Times by the submission of a Bid <br />or becoming bound under a negotiated <br />contract or <br />b. the existence of such condition could <br />reasonably have been discovered or <br />revealed as a result of any examination, <br />investigation, exploration, test, or study of <br />the Site and contiguous areas required by <br />the Bidding Requirements or Contract <br />Documents to be conducted by or for CON- <br />TRACTOR prior to CONTRACTOR's <br />making such final commitment; or <br />c. CONTRACTOR failed o give the <br />written notice within the time and as re- <br />quired by paragraph 4.03.A. <br />3. If OWNER and CONT <br />unable to agree on entitlement t <br />amount or extent, if any, of any a <br />the Contract Price or Contract Tim <br />Claim may be made therefor as <br />paragraph 10.05. However, <br />ENGINEER, and ENGINEER's <br />shall not be liable to CONTRAC <br />claims, costs, losses, or damage <br />but not limited to all fees and <br />engineers, architects, attorneys, <br />professionals and all court or arbitra <br />dispute resolution costs) su <br />CONTRACTOR on or in connecti <br />other project or anticipated project. <br />CTOR are <br />or on the <br />justment in <br />s, or both, a <br />provided in <br />OWNER, <br />Consultants <br />OR for any <br />(including <br />charges of <br />and other <br />ion or other <br />tained by <br />•n with any <br />11 <br />4.04 Underground Facilities <br />A. Shown or Indicated: The informatin and data <br />shown or indicated in the Contract Doc ments with <br />respect to existing Underground Faci ities at or <br />contiguous to the Site is based on info ation and <br />data fumished to OWNER or ENGIN ER by the <br />owners of such Underground Facilitie including <br />OWNER, or by others. Unless it i- otherwise <br />expressly provided in the Supplementary •onditions: <br />1. OWNER and ENGINEEshall not <br />be responsible for the accurac or com- <br />pleteness of any such information o data; and <br />2. the cost of all of the folio ing will be <br />included in the Contract Price, and ONTRAC- <br />TOR shall have full responsibility fo <br />a. reviewing and checkin• all such <br />information and data, <br />b. locating all Undergroun. Facilities <br />shown or indicated in the Contract <br />Documents, <br />c. coordination of the Wo with the <br />owners of such Undergroun. Facilities, <br />including OWNER, during const ction, and <br />d. the safety and protection of all such <br />Underground Facilities and repairing any <br />damage thereto resulting from th Work. <br />B. Not Shown or Indicated <br />1. If an Underground Facility is <br />uncovered or revealed at or contig ous to the <br />00700 - General Condition. REV 5-10-13.doc <br />00700 - 12 <br />F:1Public Works\ENGINEERING DIVISION PROJECTS\1314-107th Ave Milling90th St to 94th StV+dmin\bid documentstMaster Contract Documents\00700 - General Co <br />13.doc <br />tions REV 5-10- <br />