My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-005A
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-005A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 1:57:55 PM
Creation date
2/18/2016 3:02:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/06/2015
Control Number
2015-005A
Agenda Item Number
8.L.
Entity Name
Vero Lake Estates Asphalt Millings Project (Phase 1)
Subject
Widening & placement of asphalt milling
Project Number
1314
Bid Number
2015010
Supplemental fields
SmeadsoftID
14278
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site which was not shown or indicated, or not <br />shown or indicated with reasonable accuracy in <br />the Contract Documents, CONTRACTOR shall, <br />promptly after becoming aware thereof and <br />before further disturbing conditions affected <br />thereby or performing any Work in connection <br />therewith (except in an emergency as required <br />by paragraph 6.16.A), identify the owner of <br />such Underground Facility and give written <br />notice to that owner and to OWNER and ENGI- <br />NEER. ENGINEER will promptly review the <br />Underground Facility and determine the extent, <br />if any, to which a change is required in the <br />Contract Documents to reflect and document <br />the consequences of the existence or location <br />of the Underground Facility. During such time, <br />CONTRACTOR shall be responsible for the <br />safety and protection of such Underground <br />Facility. <br />2. If ENGINEER concludes that a <br />change in the Contract Documents is required, <br />a Work Change Directive or a Change Order <br />will be issued to reflect and document such <br />consequences. An equitable adjustment shall <br />be made in the Contract Price or Contract <br />Times, or both, to the extent that they are <br />attributable to the existence or location of any <br />Underground Facility that was not shown or <br />indicated or not shown or indicated with <br />reasonable accuracy in the Contract <br />Documents and that CONTRACTOR did not <br />know of and could not reasonably have been <br />expected to be aware of or to have anticipated. <br />If OWNER and CONTRACTOR are unable to <br />agree on entitlement to or on the amount or <br />extent, if any, of any such adjustment in <br />Contract Price or Contract Times, OWNER or <br />CONTRACTOR may make a Claim therefor as <br />provided in paragraph 10.05. <br />4.05 Reference Points <br />A. OWNER shall provide engineering surveys to <br />establish reference points for construction which in <br />ENGINEER's judgment are necessary to enable <br />CONTRACTOR to proceed with the Work. CON- <br />TRACTOR shall be responsible for laying out the <br />Work, shall protect and preserve the established <br />reference points and property monuments, and shall <br />make no changes or relocations without the prior <br />written approval of OWNER. CONTRACTOR shall <br />report to ENGINEER whenever any reference point or <br />property monument is lost or destroyed or requires <br />relocation because of necessary changes in grades or <br />locations, and shall be responsible for the accurate <br />replacement or relocation of such reference points or <br />property monuments by professionally qualified <br />personnel. <br />4.06 Hazardous Environmental Condifon at Site <br />A. Reports and Drawings: Referenc <br />the Supplementary Conditions for the ide <br />those reports and drawings relating to a <br />Environmental Condition identified at the <br />that have been utilized by the ENGIN <br />preparation of the Contract Documents. <br />B. Limited Reliance by CONT <br />Technical Data Authorized: CONTRACT <br />upon the general accuracy of the "tec <br />contained in such reports and drawing <br />reports and drawings are not Contract <br />Such "technical data" is identifie <br />Supplementary Conditions. Except for s <br />on such "technical data," CONTRACTOR <br />upon or make any Claim agains <br />ENGINEER or any of ENGINEER's Con <br />respect to: <br />is made to <br />tification of <br />Hazardous <br />Site, if any, <br />ER in the <br />0 <br />1. the completeness of s <br />and drawings for CONTRACTOR' <br />including, but not limited to, any a - <br />means, methods, techniques, seq <br />procedures of construction to be <br />CONTRACTOR and safety prec <br />programs incident thereto; or <br />2. other data, interpretatio <br />and information contained in suc <br />shown or indicated in such drawing <br />3. any CONTRACTOR inte <br />or conclusion drawn from any "te' <br />or any such other data, interpretati <br />or information. <br />• <br />• <br />CTOR on <br />R may rely <br />nical data" <br />, but such <br />ocuments. <br />in the <br />ch reliance <br />ay not rely <br />OWNER, <br />ultants with <br />ch reports <br />purposes, <br />pects of the <br />ences and <br />mployed by <br />utions and <br />s, opinions <br />reports or <br />; or <br />pretation of <br />hnical data" <br />ns, opinions <br />C. CONTRACTOR shall not be re-ponsible for <br />any Hazardous Environmental Condition ncovered or <br />revealed at the Site which was not shown or indicated <br />in Drawings or Specifications or iden 'fled in the <br />Contract Documents to be within the s ope of the <br />Work. CONTRACTOR shall be respo sible for a <br />Hazardous Environmental Condition crea ed with any <br />materials brought to the Site by CO TRACTOR, <br />Subcontractors, Suppliers, or anyone el -e for whom <br />CONTRACTOR is responsible. <br />D. If CONTRACTOR encounters - Hazardous <br />Environmental Condition or if CONT" CTOR or <br />anyone for whom CONTRACTOR is responsible <br />creates a Hazardous Environmental Condition, <br />CONTRACTOR shall immediately: (i) secure or <br />otherwise isolate such condition; (ii) sto• all Work in <br />connection with such condition and n any area <br />affected thereby (except in an emergen as required <br />00700 - General Conditi• s REV 5-10-13.doc <br />00700 - 13 <br />F:\Public Works1ENGINEERING DIVISION PROJECTS \1314 -107th Ave Milling90th St to 94th StAdmin\bid documentsWlaster Contract Documents\00700 - General nditions REV 5-10- <br />13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.