Laserfiche WebLink
ROUND ISLAND PARK SITE IMPROVEMENTS AGREEMENT, AMENDMENT NO. 1 <br />The Board reviewed the following memo dated 3/27/92: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />FROM: Terry B. Thompson, P.E.;JV`' <br />Capital Projects Manager <br />SUBJECT: Round Island Park Site Improvements AyreerAesU <br />Amendment No. 1 <br />DATE: March 27, 1992 <br />DESCRIPTION AND CONDITIONS <br />FILE: ripadml.agn <br />Coastal Technology Corporation is under contract with Indian <br />River County to provide professional services for <br />construction plans preparation and * permitting of site <br />improvements at Round Island Park. <br />When the Agreement was negotiated, design of the boat ramp, <br />dock and shore parallel boardwalk were not included because <br />it was anticipated that these items would be included in a <br />contract that was being negotiated with John Foster, P.A. <br />along with the design of picnic pavilions and a restroom <br />building. <br />Due to problems that have been identified with the existing <br />boat ramp at Round.Island Park, staff feels that it would be <br />in the County's best interest to have an engineer design the <br />new ramp and repairs to existing ramp. <br />Staff is negotiating a contract with John Foster to design <br />picnic pavilions and to adapt the restroom plans he prepared <br />for Treasure Shores Park to the Round Island Park Site. The <br />plans John Foster prepared for Treasure Shores that were <br />based on the restroom at Golden Sands Park were never used <br />due to FEMA requirements to elevate the restroom at Treasure <br />Shores on piles. <br />The compensation for Coastal Technology for the attached <br />amendment to prepare construction drawings and <br />specifications for the proposed boat ramp, repairs to <br />existing boat ramp, boat dock and shore parallel boardwalk <br />is $3,510. This, added to the current contract amount of <br />$9,990 results in a new contract amount of $13,500. <br />ALTERNATIVES AND ANALYSIS <br />The alternatives are as follows: <br />Alternative No. 1 <br />Authorize the attached Amendment No. 1 between Indian <br />River County and Coastal Technology Corporation. <br />50 <br />hPR 017 <br />