My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/28/1992
CBCC
>
Meetings
>
1990's
>
1992
>
4/28/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 10:54:53 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/28/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_I <br />VA 28 1992 <br />BOOK 86 <br />The attached Amendment No. 3 provides for Kimley-Horn to <br />investigate field changes, make plan revisions and re -stake <br />lake areas as required to provide final certification of the <br />completed project. <br />The compensation due the Consultant for Amendment No. 3 is <br />$1,450. This, added to the current contract amount of <br />$82,160 will result in a new contract amount of. $83,610. <br />RECOMMENDATIONS AND FUNDING <br />Staff recommends that the Board authorize the Chairman to <br />sign the attached Amendment No. 3. Funding is from Account <br />No. 418-000-169-018.00 - WIP Sandridge Phase II. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />and authorized the Chairman to execute Amendment #3 <br />to the Professional Engineering/Land Surveying <br />Services Agreement with Kimley-Horn Associates, <br />Inc., as recommended by staff. <br />AMENDMENT NO. 3 <br />IS ON FILE IN THE OFFICE OF CLERK TO THE BOARD <br />INDIAN RIVER BOULEVARD PHASE III CHANGE ORDER NO. 8 <br />The Board reviewed memo from Public Works Director Jim Davis <br />dated April 20, 1992: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis, P.E., <br />Public Works Director <br />FROM: Terry B. Thompson, P.E -$:'� <br />Capital Projects Manager <br />SUBJECT: Indian River Boulevard, Phase III - <br />Change Order No. 8 <br />DATE: April 20, 1992 FILE: irbco8.agn <br />DESCRIPTION AND CONDITIONS <br />The excavation of unsuitable soil and rock removal within <br />the roadway that was not shown on the original drawings has <br />been completed. In addition to the original contract amount <br />of 13,188 CY of subsoil excavation, 35,240 CY of unsuitable <br />soil has been excavated. This additional material was <br />mixed with 17,000 CY of embankment material and placed <br />outside the roadway on the side slopes and berms. <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.