My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to discuss and coordinate work. <br /> B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br /> Contractor will certify to the Engineer the following: <br /> 1. A listing of on-site clerical staff, supervisory personnel and their pro-rated <br /> time assigned to the contract, <br /> 2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br /> 3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br /> and a Retirement Plan, and, <br /> 4. Payment of Per Diem is a company practice for instances when <br /> compensation for Per Diem is requested. <br /> Such certification must be made by an officer or director of the Contractor with <br /> authority to bind the Contractor. Timely certification is a condition precedent to <br /> any right of the Contractor to recover compensations for such costs, and failure <br /> to timely submit the certification will constitute a full, complete, absolute and <br /> irrevocable waiver by the Contractor of any right to recover such costs. Any <br /> subsequent changes shall be certified to the Engineer as part of the cost <br /> proposal or seven calendar days in advance of performing such extra work. <br /> FDOT Table 4-3.2.1 <br /> Item Rate <br /> FICA Rate established by Law <br /> FUTA/SUTA Rate established by Law <br /> Medical Insurance Actual <br /> Holidays, Sick &Vacation Benefits Actual <br /> Retirement Benefits Actual <br /> Rates based on the National Council on <br /> Compensation Insurance basic rates tables <br /> Workers Compensation adjusted by Contractor's actual experience <br /> modification factor in effect at the time of the <br /> additional work or unforeseen work <br /> Per Diem Actual but not to exceed State of Florida's rate <br /> Insurance* Actual <br /> *Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br /> insurance coverage (such as, but not limited to, Umbrella Coverage,Automobile Insurance,etc.). <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3.06 Add the following new paragraphs immediately after paragraph GC-3.05: <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 1. Written Interpretations <br /> 2. Addenda <br /> 3. Specifications <br /> 4. Supplementary Conditions to the General Conditions <br /> 5. General Conditions <br /> 6. Approved Shop Drawings <br /> 7. Drawings <br /> 8. Referenced Standards. <br /> B. Written/computed dimensions shall govern over scaled dimensions. <br /> SC-4.02 Subsurface and Physical Conditions <br /> SC-4.02 Add the following new paragraphs immediately after paragraph GC-4.02.8: <br /> 00800-2 <br /> 00800-Supplementary Conditions 10-12 rev.doc <br /> MAA - .----- <br />
The URL can be used to link to this page
Your browser does not support the video tag.