Laserfiche WebLink
arbitration or other dispute resolution costs) 1. all persons on the Site or who may <br /> arising out of or relating to any claim or action, be affected by the Work; <br /> legal or equitable, brought by any such owner <br /> or occupant against OWNER, ENGINEER, or 2. all the Work and materials and equip- <br /> any other party indemnified hereunder to the ment to be incorporated therein, whether in <br /> extent caused by or based upon storage on or off the Site; and <br /> CONTRACTOR's performance of the Work. <br /> 3. other property at the Site or adjacent <br /> B. Removal of Debris During Performance of the thereto, including trees, shrubs, lawns, walks, <br /> Work: During the progress of the Work CONTRAC- pavements, roadways, structures, utilities, and <br /> TOR shall keep the Site and other areas free from Underground Facilities not designated for <br /> accumulations of waste materials, rubbish, and other removal, relocation, or replacement in the <br /> debris. Removal and disposal of such waste materi- course of construction. <br /> als, rubbish, and other debris shall conform to applica- <br /> ble Laws and Regulations. B. CONTRACTOR shall comply with all applica- <br /> ble Laws and Regulations relating to the safety of <br /> C. Cleaning: Prior to Substantial Completion of persons or property, or to the protection of persons or <br /> the Work CONTRACTOR shall clean the Site and property from damage, injury, or loss; and shall erect <br /> make it ready for utilization by OWNER. At the com- and maintain all necessary safeguards for such safety <br /> pletion of the Work CONTRACTOR shall remove from and protection. CONTRACTOR shall notify owners of <br /> the Site all tools, appliances, construction equipment adjacent property and of Underground- Facilities and <br /> and machinery, and surplus materials and shall other utility owners when prosecution of the Work may <br /> restore to original condition all property not designated affect them, and shall cooperate with them in the <br /> for alteration by the Contract Documents. protection, removal, relocation, and replacement of <br /> their property. All damage, injury, or loss to any <br /> D. Loading Structures: CONTRACTOR shall not property referred to in paragraph 6.13.A.2 or 6.13.A.3 <br /> load nor permit any part of any structure to be loaded caused, directly or indirectly, in whole or in part, by <br /> in any manner that will endanger the structure, nor CONTRACTOR, any Subcontractor, Supplier, or any <br /> shall CONTRACTOR subject any part of the Work or other individual or entity directly or indirectly employed <br /> adjacent property to stresses or pressures that will by any of them to perform any of the Work, or anyone <br /> endanger it. for whose acts any of them may be liable, shall be <br /> remedied by CONTRACTOR (except damage or loss <br /> 6.12 Record Documents attributable to the fault of Drawings or Specifications <br /> or to the acts or omissions of OWNER or ENGINEER <br /> A. CONTRACTOR shall maintain in a safe place or ENGINEER's Consultant, or anyone employed by <br /> at the Site one record copy of all Drawings, Specifica- any of them, or anyone for whose acts any of them <br /> tions, Addenda, Written Amendments, Change may be liable, and not attributable, directly or <br /> Orders, Work Change Directives, Field Orders, and indirectly, in whole or in part, to the fault or negligence <br /> written interpretations and clarifications in good order of CONTRACTOR or any Subcontractor, Supplier, or <br /> and annotated to show changes made during other individual or entity directly or indirectly employed <br /> construction. These record documents together with by any of them). CONTRACTOR's duties and <br /> all approved Samples and a counterpart of all responsibilities for safety and for protection of the <br /> approved Shop Drawings will be available to ENGI- Work shall continue until such time as all the Work is <br /> NEER for reference. Upon completion of the Work, completed and ENGINEER has issued a notice to <br /> these record documents, Samples, and Shop OWNER and CONTRACTOR in accordance with <br /> Drawings will be delivered to ENGINEER for OWNER. paragraph 14.07.13 that the Work is acceptable <br /> (except as otherwise expressly provided in connection <br /> 6.13 Safety and Protection with Substantial Completion). <br /> A. CONTRACTOR shall be solely responsible 6.14 Safety Representative <br /> for initiating, maintaining and supervising all safety <br /> precautions and programs in connection with the A. CONTRACTOR shall designate a qualified <br /> Work. CONTRACTOR shall take all necessary and experienced safety representative at the Site <br /> precautions for the safety of, and shall provide the whose duties and responsibilities shall be the <br /> necessary protection to prevent damage, injury or loss prevention of accidents and the maintaining and <br /> to: supervising of safety precautions and programs. <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-23 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />