Laserfiche WebLink
6.15 Hazard Communication Programs approval of the pertinent submittal will be at the sole <br /> expense and responsibility of CONTRACTOR. <br /> A. CONTRACTOR shall be responsible for <br /> coordinating any exchange of material safety data D. Submittal Procedures <br /> sheets or other hazard communication information <br /> required to be made available to or exchanged be- 1. Before submitting each Shop <br /> tween or among employers at the Site in accordance Drawing or Sample, CONTRACTOR shall have <br /> with Laws or Regulations. determined and verified: <br /> 6.16 Emergencies a. all field measurements, quantities, <br /> dimensions, specified performance criteria, <br /> A. In emergencies affecting the safety or protec- installation requirements, materials, catalog <br /> tion of persons or the Work or property at the Site or numbers, and similar information with <br /> adjacent thereto, CONTRACTOR is obligated to act to respect thereto; <br /> prevent threatened damage, injury, or loss. <br /> CONTRACTOR shall give ENGINEER prompt written b. all materials with respect to intended <br /> notice if CONTRACTOR believes that any significant use, fabrication, shipping, handling, storage, <br /> changes in the Work or variations from the Contract assembly, and installation pertaining to the <br /> Documents have been caused thereby or are required performance of the Work; <br /> as a result thereof. If ENGINEER determines that a <br /> change in the Contract Documents is required be- c. all information relative to means, <br /> cause of the action taken by CONTRACTOR in methods, techniques, sequences, and <br /> response to such an emergency, a Work Change procedures of construction and safety <br /> Directive or Change Order will be issued. precautions and programs incident thereto; <br /> and <br /> 6.17 Shop Drawings and Samples <br /> d. CONTRACTOR shall also have <br /> A. CONTRACTOR shall submit Shop Drawings reviewed and coordinated each Shop <br /> to ENGINEER for review and approval in accordance Drawing or Sample with other Shop <br /> with the acceptable schedule of Shop Drawings and Drawings and Samples and with the <br /> Sample submittals. All submittals will be identified as requirements of the Work and the Contract <br /> ENGINEER may require and in the number of copies Documents. <br /> specified in the General Requirements. The data <br /> shown on the Shop Drawings will be complete with 2. Each submittal shall bear a stamp or <br /> respect to quantities, dimensions, specified perfor- specific written indication that CONTRACTOR <br /> mance and design criteria, materials, and similar data has satisfied CONTRACTOR's obligations <br /> to show ENGINEER the services, materials, and under the Contract Documents with respect to <br /> equipment CONTRACTOR proposes to provide and CONTRACTOR's review and approval of that <br /> to enable ENGINEER to review the information for the submittal. <br /> limited purposes required by paragraph 6.17.E. <br /> 3. At the time of each submittal, CON- <br /> B. CONTRACTOR shall also submit Samples to TRACTOR shall give ENGINEER specific <br /> ENGINEER for review and approval in accordance written notice of such variations, if any, that the <br /> with the acceptable schedule of Shop Drawings and Shop Drawing or Sample submitted may have <br /> Sample submittals. Each Sample will be identified from the requirements of the Contract <br /> clearly as to material, Supplier, pertinent data such as Documents, such notice to be in a written com- <br /> catalog numbers, and the use for which intended and munication separate from the submittal; and, in <br /> otherwise as ENGINEER may require to enable ENGI- addition, shall cause a specific notation to be <br /> NEER to review the submittal for the limited purposes made on each Shop Drawing and Sample sub- <br /> required by paragraph 6.17.E. The numbers of each miffed to ENGINEER for review and approval of <br /> Sample to be submitted will be as specified in the each such variation. <br /> Specifications. <br /> E. ENGINEER's Review <br /> C. Where a Shop Drawing or Sample is required <br /> by the Contract Documents or the schedule of Shop 1. ENGINEER will timely review and <br /> Drawings and Sample submittals acceptable to ENGI- approve Shop Drawings and Samples in <br /> NEER as required by paragraph 2.07, any related accordance with the schedule of Shop <br /> Work performed prior to ENGINEER's review and Drawings and Sample submittals acceptable to <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-24 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert ImprovementWdmim\bid documents\00700-General Conditions REV 04-07.doe <br />